Skip to content

AI data center sites

Search sites, programs and supporting energy records by location, company, status or capacity.

1,114 public records · About catalogue coverage

Search property-level records across markets, participants, capacity, development activity, infrastructure and supporting evidence.

1,043 site records69 program records2 energy assets / agreements1,105 detailed profiles9 sourced research records

Record types partition the public catalogue; detailed and sourced-research labels describe those same records, not additional sites. Site records are not a deduplicated count of physical campuses. Overlapping campus, phase or tenant scopes must not be added together.

Clear all filters

Site and program directory

285 results · Page 6 of 6

Operating sites are selected by recorded lifecycle status, not operating MW. Each capacity figure keeps its own stage and scope.

Capacity stages and scopes differ; do not add figures together. How to compare

173 of 285 matching records have an eligible headline. Select both basis and stage for a like-for-like view. Bounds, physical scope and reporting dates still differ; this is not an additive capacity total.

Summit Elk Grove Village Data CenterSite · Connected record
Elk Grove Village, Illinois, United States
Summit
Operating
36.4 MW
Basis: Critical ITPlanned critical IT
Summit
Oct 28, 2026
Switch Tahoe Reno Citadel CampusSite · Connected record
Tahoe Reno Industrial Center, Nevada, United States
Capital DynamicsDigitalBridge
Operating
850 MW
Basis: Basis not specifiedPlanned / design
Capital Dynamics
Oct 28, 2026
TELUS Rimouski Sovereign AI FactorySite · Connected record
Rimouski, Quebec, Canada
AccentureHewlett Packard Enterprise
Operating
Not establishedIn published records
TELUS
Oct 28, 2026
Teraco CT1 RondeboschSite · Connected record
Rondebosch, Cape Town, WC, South Africa
Digital Realty TrustTeraco Data Environments
Operating
3 MW
Basis: Critical ITPlanned critical IT
Digital Realty Trust
Oct 28, 2026
Teraco CT2 BrackenfellSite · Connected record
Brackenfell, Cape Town, WC, South Africa
Digital Realty TrustTeraco Data Environments
Operating
50 MW
Basis: Critical ITPlanned critical IT
Digital Realty Trust
Oct 28, 2026
TierPoint Boston–Marlborough Data CenterSite · Connected record
Marlborough, Massachusetts, United States
TierPoint
Operating
Not establishedIn published records
TierPoint
Oct 28, 2026
TierPoint Seattle Data CenterSite · Connected record
Seattle, Washington, United States
TierPoint
Operating
Not establishedIn published records
TierPoint
Oct 28, 2026
TRG HOU1 Houston Data CenterSite · Connected record
Spring, Texas, United States
TRG Datacenters
Operating
6 MW
Basis: Utility / grid serviceUtility capacity
TRG Datacenters
Oct 28, 2026
US Signal AZ01 Phoenix Data CenterSite · Connected record
Gilbert, Arizona, United States
US Signal
Operating
0.5 MW
Basis: Basis not specifiedPlanned / design
US Signal
Oct 28, 2026
US Signal IA01 Des Moines Data CenterSite · Connected record
Waukee, Iowa, United States
US Signal
Operating
0.2 MW
Basis: Critical ITPlanned critical IT
US Signal
Oct 28, 2026
US Signal IN01 Indianapolis Data CenterSite · Connected record
Indianapolis, Indiana, United States
US Signal
Operating
0.3 MW
Basis: Basis not specifiedPlanned / design
US Signal
Oct 28, 2026
US Signal IN02 Indianapolis Data CenterSite · Connected record
Indianapolis, Indiana, United States
US Signal
Operating
1.6 MW
Basis: Basis not specifiedPlanned / design
US Signal
Oct 28, 2026
US Signal MI03 Detroit Data CenterSite · Connected record
Belleville, Michigan, United States
US Signal
Operating
1.5 MW
Basis: Basis not specifiedPlanned / design
US Signal
Oct 28, 2026
US Signal MN01 Minneapolis Data CenterSite · Connected record
Eden Prairie, Minnesota, United States
US Signal
Operating
0.5 MW
Basis: Critical ITPlanned critical IT
US Signal
Oct 28, 2026
US Signal OR01 Bend Data CenterSite · Connected record
Bend, Oregon, United States
US Signal
Operating
Not establishedIn published records
US Signal
Oct 28, 2026
US Signal WI02 Madison Data CenterSite · Connected record
Fitchburg, Wisconsin, United States
US Signal
Operating
0.6 MW
Basis: Critical ITPlanned critical IT
US Signal
Oct 28, 2026
ValorC3 St. George Data CenterSite · Connected record
St. George, Utah, United States
ValorC3
Operating
4 MW
Basis: Basis not specifiedPlanned / design
ValorC3
Oct 28, 2026
Vantage CA1 Santa Clara Data Center CampusSite · Connected record
Santa Clara, California, United States
Silicon Valley PowerVantage Data Centers
Operating
77 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage HKG1 On Lok Data CenterSite · Connected record
Fanling, New Territories, Hong Kong, Hong Kong SAR China
CLP Power Hong KongVantage Data Centers
Operating
5 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage HKG2 Fo Tan Data CenterSite · Connected record
Fo Tan, Hong Kong, Hong Kong SAR China
CLP Power Hong KongVantage Data Centers
Operating
13 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage HKG3 Kwai Chung Data CenterSite · Connected record
Kwai Chung, Hong Kong, Hong Kong SAR China
CLP Power Hong KongVantage Data Centers
Operating
14 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage KUL1 Cyberjaya Data Center CampusSite · Connected record
Cyberjaya, Selangor, Malaysia
Tenaga Nasional BerhadVantage Data Centers
Operating
31 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage LHR2 London Data CenterSite · Connected record
Park Royal, London, England, United Kingdom
Vantage Data Centers
Operating
20 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage QC1 Montreal Data CenterSite · Connected record
Montreal, Quebec, Canada
Hydro-QuébecVantage Data Centers
Operating
11 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage QC6 Montreal Data CenterSite · Connected record
Montreal, Quebec, Canada
Hydro-QuébecVantage Data Centers
Operating
30 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage TPE11 TaipeiSite · Connected record
Taoyuan district / Taipei market, Taiwan
Cathay United BankCTBC Bank
Operating
16 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage WA1 Quincy Data Center CampusSite · Connected record
Quincy, Washington, United States
Grant County Public Utility DistrictVantage Data Centers
Operating
89 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage ZRH2 Zurich CampusSite · Connected record
Glattfelden / Zurich region, ZH, Switzerland
BSIGemeinde Glattfelden
Operating
24 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
VIRTUS London 1 Enfield Data CentreSite · Connected record
Enfield, England, United Kingdom
VIRTUS Data Centres
Operating
4.2 MW
Basis: Critical ITPlanned critical IT
VIRTUS Data Centres
Oct 28, 2026
VIRTUS London 2 Hayes Data CentreSite · Connected record
Hayes, England, United Kingdom
VIRTUS Data Centres
Operating
12.3 MW
Basis: Critical ITPlanned critical IT
VIRTUS Data Centres
Oct 28, 2026
VITRO Santa Rosa Data CenterSite · Connected record
Santa Rosa, Laguna, Philippines
ePLDTVITRO Inc.
Operating
36 MW
Basis: Critical ITPlanned critical IT
ePLDT
Oct 28, 2026
xAI Colossus 1Site · Sourced research
Southwest Memphis, Shelby County, Tennessee, United States
xAINVIDIA
Operational
Not establishedIn published records
xAI
Oct 28, 2026
Yahoo Quincy Data Center CampusSite · Connected record
Quincy, Washington, United States
Grant County PUDYahoo Inc.
Operating
Not establishedIn published records
Yahoo Inc.
Oct 28, 2026
Yondr Frankfurt Bischofsheim Data CenterSite · Connected record
Bischofsheim, Hesse, Germany
Yondr Group
Operating
40 MW
Basis: Critical ITPlanned critical IT
Yondr Group
Oct 28, 2026
Yondr London Campus Building 1Site · Connected record
Slough, England, United Kingdom
Yondr Group
Operating
30 MW
Basis: Critical ITPlanned critical IT
Yondr Group
Oct 28, 2026

Every figure carries its capacity stage. Operating, contracted, planned/design and utility-service values remain distinct; generation is never used as site capacity. A missing figure does not mean zero; other scoped figures may appear in the profile.