Search sites, programs and supporting energy records by location, company, status or capacity.

1,114 public records · About catalogue coverage

Search property-level records across markets, participants, capacity, development activity, infrastructure and supporting evidence.

1,043 site records69 program records2 energy assets / agreements1,105 detailed profiles9 sourced research records

Record types partition the public catalogue; detailed and sourced-research labels describe those same records, not additional sites. Site records are not a deduplicated count of physical campuses. Overlapping campus, phase or tenant scopes must not be added together.

Site and program directory

1,114 results · Page 23 of 23
Capacity stages and scopes differ; do not add figures together. How to compare

726 of 1114 matching records have an eligible headline. Select both basis and stage for a like-for-like view. Bounds, physical scope and reporting dates still differ; this is not an additive capacity total.

xAI–HUMAIN Saudi AI Infrastructure ProgramProgram · Connected record
Saudi Arabia; site undisclosed, Saudi Arabia
HUMAINKingdom of Saudi Arabia
Proposed
Not establishedIn published records
HUMAIN
Oct 28, 2026
Yahoo Quincy Data Center CampusSite · Connected record
Quincy, Washington, United States
Grant County PUDYahoo Inc.
Operating
Not establishedIn published records
Yahoo Inc.
Oct 28, 2026
Yandex Vladimir AI Data CenterSite · Connected record
Vladimir, VLA, Russia
Yandex
Construction
More than 40 MW
Basis: Basis not specifiedFacility design
Yandex
Oct 28, 2026
Yondr Berlin Ragow Data Center CampusSite · Connected record
Ragow, Brandenburg, Germany
Yondr Group
Construction
42 MW
Basis: Critical ITPlanned critical IT
Yondr Group
Oct 28, 2026
Yondr Dallas Lancaster Data Center CampusSite · Connected record
Lancaster, Texas, United States
Yondr Group
Preconstruction
550 MW
Basis: Critical ITPlanned critical IT
Yondr Group
Oct 28, 2026
Yondr Frankfurt Bischofsheim Data CenterSite · Connected record
Bischofsheim, Hesse, Germany
Yondr Group
Operating
40 MW
Basis: Critical ITPlanned critical IT
Yondr Group
Oct 28, 2026
Yondr London Campus Building 1Site · Connected record
Slough, England, United Kingdom
Yondr Group
Operating
30 MW
Basis: Critical ITPlanned critical IT
Yondr Group
Oct 28, 2026
Yondr London Campus Building 2Site · Connected record
Slough, England, United Kingdom
Yondr Group
Partially operational
30 MW
Basis: Critical ITPlanned critical IT
Yondr Group
Oct 28, 2026
Yondr London Campus Building 3Site · Connected record
Slough, England, United Kingdom
Yondr Group
Construction
40 MW
Basis: Critical ITPlanned critical IT
Yondr Group
Oct 28, 2026
Yondr Loudoun County Data Center CampusSite · Connected record
Leesburg, Virginia, United States
Yondr Group
Partially operational
336 MW
Basis: Critical ITPlanned critical IT
Yondr Group
Oct 28, 2026
Yondr Toronto Data CenterSite · Connected record
Toronto, Ontario, Canada
Yondr Group
Construction
27 MW
Basis: Critical ITPlanned critical IT
Yondr Group
Oct 28, 2026
Yondr–Cerberus Manassas Data Center CampusSite · Connected record
Manassas, Virginia, United States
Cerberus Capital ManagementYondr Group
Preconstruction
72 MW
Basis: Basis not specifiedPlanned / design
Yondr Group
Oct 28, 2026
COPT Van Meter CampusSite · Connected record
Van Meter, Iowa, United States
COPT Defense PropertiesMicrosoft
Proposed
1,000 MW
Basis: Basis not specifiedPlanned / design
COPT Defense Properties
Aug 28, 2026
Trammell Crow Georgia CampusSite · Connected record
Social Circle, Georgia, United States
Trammell Crow Company
Proposed
Not establishedIn published records
Trammell Crow Company
Aug 28, 2026

Every figure carries its capacity stage. Operating, contracted, planned/design and utility-service values remain distinct; generation is never used as site capacity. A missing figure does not mean zero; other scoped figures may appear in the profile.