Cartis site intelligence
AI data center sites
Search property-level records across markets, participants, capacity, development activity, infrastructure and supporting evidence.
970 site records69 program records1022 fully connected17 sourced research records
Site and program directory
Search markets, owners, developers, operators, utilities and connected organizations.
10 results · 50 per page
RecordStatusCapacityOwner / developerLast verified
Vantage JHB1 Johor Data Center CampusReviewed site record
Sedenak, Johor, Malaysia
Abu Dhabi Investment AuthorityGIC
Partially operational
300 MW
Planned critical ITVantage Data Centers
Aug 28, 2026
AirTrunk JHB3 Data Center CampusReviewed site record
Johor Bahru, Johor, Malaysia
AirTrunkTenaga Nasional Berhad
Status Under Review
280 MW
Planned / designAirTrunk
Sep 1, 2026
AirTrunk JHB2 Data Center CampusReviewed site record
Johor Bahru, Johor, Malaysia
AirTrunkInternational Finance Corporation
Under construction
270 MW
Planned / designAirTrunk
Aug 25, 2026
STACK JHB01 Iskandar Puteri Data Center CampusReviewed site record
Iskandar Puteri, Johor, Malaysia
STACK InfrastructureTenaga Nasional Berhad
Under construction
220 MW
Planned critical ITSTACK Infrastructure
Aug 28, 2026
AirTrunk JHB4 Data Center CampusReviewed site record
Johor Bahru, Johor, Malaysia
AirTrunkTenaga Nasional Berhad
Status Under Review
142 MW
Planned critical ITAirTrunk
Sep 1, 2026
Bridge Data Centres MY06 — ByteDance JohorReviewed site record
Sedenak, Johor, Malaysia
Bridge Data CentresByteDance
Operating / Stabilized
110 MW
Planned critical ITBridge Data Centres
Aug 27, 2026
Racks Central RCJM Johor AI Factory CampusReviewed site record
Pasir Gudang, Johor, Malaysia
Racks Central
Under construction
70 MW
ContractedRacks Central
Aug 27, 2026
AirTrunk JHB1 Data Center CampusReviewed site record
Johor Bahru, Johor, Malaysia
AirTrunkTenaga Nasional Berhad
Partially operational
50 MW
Operating critical ITAirTrunk
Aug 25, 2026
AirTrunk Malaysia Data Center PlatformReviewed program record
Johor Bahru, Johor, Malaysia
AirTrunkBlackstone
Status Under Review
—
Not disclosedAirTrunk
Aug 25, 2026
STT Johor Campus / STT Johor 1Reviewed site record
Nusa Cemerlang Industrial Park, Iskandar Puteri, Johor, JHR, Malaysia
Ditrolic EnergyJohor State Government
Under construction
—
Not disclosedSTT GDC Malaysia
Aug 22, 2026