STACK JHB01 Iskandar Puteri Data Center Campus
- Planned critical IT
- 220 MW
- Updated
- Oct 28, 2026
- Utility
- Tenaga Nasional Berhad
STACK JHB01 Iskandar Puteri Data Center Campus, also known as STACK Johor Bahru Campus, is a data center project in Iskandar Puteri, Johor, MY developed and operated by STACK Infrastructure. 10.8-hectare flagship Johor Bahru campus with two facilities totaling about one million square feet and 220 MW. TNB 275 kV infrastructure, onsite substation, redundant site entries and a fiber ring to multiple telecommunications networks. The January 2025 project announcement states 220 MW, while STACK’s current APAC index reports 216 MW for Johor Bahru. The cited identity or capacity sources conflict and do not establish a single project-scoped capacity figure.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
The January 2025 project announcement states 220 MW, while STACK’s current APAC index reports 216 MW for Johor Bahru. The available public sources do not establish a single project-scoped capacity figure.
Milestones (2)
Jan 14, 2025 · Recorded actual event
Completed · Announced
Source not linked2026 · Forecast / planned record
Forecast · Forecast completion
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- STACK announces 220MW campus in Malaysia · Jan 14, 2025 · Primary
Other participants (1)
Utility provider
Sources by role
Utility provider (1)
- STACK announces 220MW campus in Malaysia · Jan 14, 2025 · Primary
Site & development
Additional project facts
Infrastructure & permits
Technical details (3)
Planned or represented
TNB 275 kV infrastructure, onsite substation, redundant site entries and a fiber ring to multiple telecommunications networks.
Planned or represented
STACK markets diverse fiber and carrier-neutral deployment options; installed and contracted capacity remain distinct.
Planned or represented
275 kV
TNB high-voltage infrastructure and an onsite substation support the phased campus plan.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (4)
Partially operational · Johor Bahru, Johor, Malaysia
Shared participant: Tenaga Nasional Berhad · Same market: Johor, Malaysia
Compare in a collectionUnder construction · Johor Bahru, Johor, Malaysia
Shared participant: Tenaga Nasional Berhad · Same market: Johor, Malaysia
Compare in a collectionStatus under review · Johor Bahru, Johor, Malaysia
Shared participant: Tenaga Nasional Berhad · Same market: Johor, Malaysia
Compare in a collectionStatus under review · Johor Bahru, Johor, Malaysia
Shared participant: Tenaga Nasional Berhad · Same market: Johor, Malaysia
Compare in a collection