Racks Central RCJM Johor AI Factory Campus

Pasir Gudang, Johor, MalaysiaUnder construction
Capacity
70 MW
Contracted
Lead participant
Racks Central
Developer
Last updated
Aug 27, 2026
Most recent public record update

About Racks Central RCJM Johor AI Factory Campus

Racks Central is building the RCJM AI Factory Campus in Pasir Gudang, Johor. The first facility is fully committed for 70 MW of IT load, while the combined campus plan reaches 510 MW. Racks Central is associated with the development in Pasir Gudang, Johor, MY. The disclosed development scope includes 70 MW committed IT load in RCJM1; 510 MW combined campus design; first service targeted Q1 2027. Power and physical infrastructure include high-density AI campus with a phased Johor delivery program. Racks Central states RCJM1 is fully committed for 70 MW of IT load.

Capacity

Contracted
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Contracted Supply70 MWActual · Racks Central RCJM Johor AI Factory Campus
Contracted Supply70 MWActual · Racks Central RCJM Johor AI Factory Campus

Development

1 phases · 2 milestones
Construction programUnder Construction

Project-wide phase for Racks Central RCJM Johor AI Factory Campus; capacity class is contracted supply.

Aug 12, 2026
RCJM Pasir Gudang Campus development disclosed
Completed
Construction milestone reached; first phase committed
Forecast

Infrastructure

Electric GridPlanned Or Represented

70 MW

Racks Central states RCJM1 is fully committed for 70 MW of IT load.

Site FacilityPlanned Or Represented

High-density AI campus with a phased Johor delivery program.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
RCJM campus | Pasir Gudang | Johor | Malaysia
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
70 MW
Actual
Capacity Basis
Racks Central states RCJM1 is fully committed for 70 MW of IT load.
Actual
Location Context
RCJM campus | Pasir Gudang | Johor | Malaysia
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
70 MW
Actual
Capacity Basis
Racks Central states RCJM1 is fully committed for 70 MW of IT load.
Actual
Development Scale
70 MW committed IT load in RCJM1
Actual
Development Milestone
510 MW combined campus design
Actual
Power Arrangement
First service targeted Q1 2027.
Actual
Site Configuration
RCJM campus | Pasir Gudang | Johor | Malaysia
Actual