AirTrunk JHB4 Data Center Campus

Johor Bahru, Johor, MalaysiaStatus Under Review
Capacity
142 MW
Planned critical IT
Lead participant
AirTrunk
Developer · Operator
Last updated
Sep 1, 2026
Most recent public record update

About AirTrunk JHB4 Data Center Campus

Fourth named AirTrunk Malaysia campus announced in April 2026; detailed parcel and delivery schedule remain open. AirTrunk JHB4 Data Center Campus is in Johor Bahru, Johor, MY and is a data center campus with planned status. Participants include AirTrunk as developer, Tenaga Nasional Berhad as utility. Development comprises JHB4 development (planned). Key milestones include JHB4 announced. (2026-04-30).

Program relationships

1 linked

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential142 MWActual · AirTrunk JHB4 Data Center Campus

Development

2 phases · 2 milestones
JHB4 developmentPlanned

Part of combined >280-MW JHB3/JHB4 announcement.

JHB4 full campusAnnounced Or Preconstruction

Eight data halls across multiple buildings; building sequence undisclosed.

Apr 30, 2026
JHB4 announced
Completed
Apr 30, 2026
JHB4 announced with 142+ MW campus profile
Completed

Infrastructure

Electric GridPlanned Or Represented

275 kV

Permanent dual feed planned from JHB2; delivered MW and energization date undisclosed.

Water SupplyPlanned Or Represented

Advanced cooling is designed to use 100% recycled water; source and volume agreements undisclosed.

FiberPlanned Or Represented

Carrier-neutral design with multiple entry paths; carriers and service dates undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

10 facts
Planned It Load Over
142 MW
Actual
Site Area
5.59 hectares
Actual
Planned Data Halls
8 data halls
Actual
Technical Data Hall Area
11,150 square metres
Actual
Office And Storage Area
3,300 square metres
Actual
Planned Power Feed Voltage
275 kV
Actual
Permanent Dual Feed From Jhb2
True
Actual
Design Pue
1.3
Actual
Carrier Neutral Design
True
Actual
Recycled Water Cooling Design
True
Actual