Bridge Data Centres MY06 — ByteDance Johor

Sedenak, Johor, MalaysiaOperating
Evidence
Planned critical IT
110 MW
Updated
Oct 28, 2026

Bridge Data Centres opened the first phase of MY06 in Johor in October 2022. The three-building campus is designed for 110 MW of IT load, with ByteDance identified as an anchor customer. Later phases extend the operating campus rather than changing the basis of the 110 MW design figure.

Capacity

Reported capacity

Planned / design or future potential

110 MW

Source

Capacity

Design

110 MW

Source

Capacity basis

Actual

110 MW facility or campus IT design capacity

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating campusOperational

Bridge Data Centres MY06 — ByteDance Johor: Operating campus.

Milestones (2)
Bridge Data Centres MY06 — ByteDance Johor — Operating campus

Oct 20, 2022 · Recorded actual event

Completed · Commercial operation

Source not linked
Bridge Data Centres opened the first phase of MY06 in Johor in October 2022.

Date not disclosed · Recorded actual event

Completed · Status changed

Source not linked

Participants

Bridge Data Centres

Developer

Sources by role
ByteDance

Tenant

Sources by role

Site & development

Location context

Actual

MY06 | Sedenak Tech Park | Johor | Malaysia

Source

Location

Actual

Sedenak, Johor, MY

Source

Development scale

Actual

Bridge Data Centres opened the first phase of MY06 in Johor in October 2022. The three building campus is designed for 110 MW of IT load, with ByteDance identified as an anchor customer

Source

Additional project facts

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

Official three building project design capacity

Source

Project identity

Actual

Bridge Data Centres MY06 — ByteDance Johor

Source

Lifecycle status

Actual

Operating campus

Source

Participant roles

Actual

Bridge Data Centres, ByteDance

Source

Infrastructure

Actual

Later phases extend the operating campus rather than changing the basis of the 110 MW design figure.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Operational

110 MW

110 MW facility or campus IT design capacity

Site facility

Operational

Later phases extend the operating campus rather than changing the basis of the 110 MW design figure.

Public-source research. Plans may change. See Evidence for sources and qualifications.