Bridge Data Centres MY06 — ByteDance Johor
- Planned critical IT
- 110 MW
- Updated
- Oct 28, 2026
Bridge Data Centres opened the first phase of MY06 in Johor in October 2022. The three-building campus is designed for 110 MW of IT load, with ByteDance identified as an anchor customer. Later phases extend the operating campus rather than changing the basis of the 110 MW design figure.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Bridge Data Centres MY06 — ByteDance Johor: Operating campus.
Milestones (2)
Oct 20, 2022 · Recorded actual event
Completed · Commercial operation
Source not linkedDate not disclosed · Recorded actual event
Completed · Status changed
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Bridge Data Centres and ByteDance celebrate MY06 Phase 1 opening · Oct 20, 2022 · Primary
Tenant
Sources by role
Tenant (1)
- Bridge Data Centres and ByteDance celebrate MY06 Phase 1 opening · Oct 20, 2022 · Primary
Site & development
Development scale
ActualBridge Data Centres opened the first phase of MY06 in Johor in October 2022. The three building campus is designed for 110 MW of IT load, with ByteDance identified as an anchor customer
SourceAdditional project facts
Infrastructure
ActualLater phases extend the operating campus rather than changing the basis of the 110 MW design figure.
SourceInfrastructure & permits
Technical details (2)
Operational
110 MW
110 MW facility or campus IT design capacity
Operational
Later phases extend the operating campus rather than changing the basis of the 110 MW design figure.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (1)
Partially operational · Sedenak, Johor, Malaysia
Same locality: Sedenak
Compare in a collection