Skip to content

AI data center sites

Search sites, programs and supporting energy records by location, company, status or capacity.

1,114 public records · About catalogue coverage

Search property-level records across markets, participants, capacity, development activity, infrastructure and supporting evidence.

1,043 site records69 program records2 energy assets / agreements1,105 detailed profiles9 sourced research records

Record types partition the public catalogue; detailed and sourced-research labels describe those same records, not additional sites. Site records are not a deduplicated count of physical campuses. Overlapping campus, phase or tenant scopes must not be added together.

Clear all filters

Site and program directory

11 results · Page 1 of 1
Capacity stages and scopes differ; do not add figures together. How to compare

10 of 11 matching records have an eligible headline. Select both basis and stage for a like-for-like view. Bounds, physical scope and reporting dates still differ; this is not an additive capacity total.

Caldwell Valley (Tract)Site · Connected record
Uhland, Texas, United States
Tract
Proposed
4,000 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026
Farmington Technology Park / TractProgram · Connected record
Farmington, Minnesota, United States
City of FarmingtonDakota County District Court
Status under review
Not establishedIn published records
MNLCO Farmington Two, LLC
Oct 28, 2026
Hanover Technology ParkSite · Connected record
Ashland, Virginia, United States
Tract
Proposed
2,400 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026
Haven Oak Technology ParkSite · Connected record
Dinwiddie County, Virginia, United States
Tract
Proposed
900 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026
Peru Shelf Technology ParkSite · Connected record
Sparks, Nevada, United States
Tract
Preconstruction
810 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026
South Valley Technology ParkSite · Connected record
Sparks, Nevada, United States
Tract
Preconstruction
1,200 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026
Tract Buckeye Technology ParkSite · Connected record
Buckeye, Arizona, United States
Tract
Preconstruction
1,800 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026
Tract Des MoinesSite · Connected record
Altoona, Iowa, United States
Tract
Proposed
1,000 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026
Tract Illinois (Morris)Site · Connected record
Morris, Illinois, United States
Tract
Proposed
1,000 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026
Tract Silver Springs Technology ParkSite · Connected record
Silver Springs, Nevada, United States
Tract
Preconstruction
1,600 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026
Tract Tuckahoe Technology ParkSite · Connected record
Manakin-Sabot, Virginia, United States
Tract
Proposed
900 MW
Basis: Basis not specifiedPlanned / design
Tract
Oct 28, 2026

Every figure carries its capacity stage. Operating, contracted, planned/design and utility-service values remain distinct; generation is never used as site capacity. A missing figure does not mean zero; other scoped figures may appear in the profile.