Skip to content

Caldwell Valley (Tract)

Uhland, Texas, United StatesProposed
Evidence
Planned / design
4,000 MW
Updated
Oct 28, 2026

Caldwell Valley is Tract’s powered-land technology park near Uhland, Texas. Tract reports roughly 2,973 acres, multiple campus parcels, a 4 GW full-build power opportunity, adjacency to 345 kV transmission and a natural-gas pipeline, with initial site energization targeted for 2028. The figure is a site-development capacity ceiling, not current IT load or a tenant commitment. Detailed building programs, customers, permits and phase financing remain to be announced.

Capacity

Reported capacity

Planned / design or future potential

4,000 MW

Source

Reported capacity

Planned / design or future potential

4,000 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Powered-land and utility developmentAnnounced or preconstruction

Caldwell Valley is Tract’s powered-land technology park near Uhland, Texas. Tract reports roughly 2,973 acres, multiple campus parcels, a 4 GW full-build power opportunity, adjacency to 345 kV transmission and a natural-gas pipeline, with initial site energization targeted for 2028. The figure is a site-development capacity ceiling, not current IT load or a tenant commitment. Detailed building programs, customers, permits and phase financing remain to be announced.

Milestones (2)
Tract closed incremental land acquisitions

Oct 14, 2025 · Recorded actual event

Completed · Land acquired

Source not linked
Target site energization

2028 · Forecast / planned record

Forecast · Forecast completion

Source not linked

Participants

Tract

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Caldwell Valley (Tract) | Uhland | Texas | US

Source

Location context

Actual

Caldwell Valley (Tract) | Uhland | Texas | US

Source

Site area

Actual

2,973 acres

Source

Additional project facts

Lifecycle status

Actual

Proposed

Source

Capacity basis

Actual

4,000 MW future full build site capacity; not measured operating IT load.

Source

Lifecycle status

Actual

Proposed

Source

Capacity basis

Actual

4,000 MW is a developer published full build powered land capacity envelope.

Source

Target energization

Actual

2,028

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

4,000 MW

Adjacent 345 kV transmission; upgrades and delivery remain phased.

Natural gas pipeline

Reported context

Natural-gas pipeline adjacency reported by developer.

Public-source research. Plans may change. See Evidence for sources and qualifications.