Skip to content

AI data center sites

Search sites, programs and supporting energy records by location, company, status or capacity.

1,114 public records · About catalogue coverage

Search property-level records across markets, participants, capacity, development activity, infrastructure and supporting evidence.

1,043 site records69 program records2 energy assets / agreements1,105 detailed profiles9 sourced research records

Record types partition the public catalogue; detailed and sourced-research labels describe those same records, not additional sites. Site records are not a deduplicated count of physical campuses. Overlapping campus, phase or tenant scopes must not be added together.

Clear all filters

Site and program directory

7 results · Page 1 of 1
Capacity stages and scopes differ; do not add figures together. How to compare

7 of 7 matching records have an eligible headline. Select both basis and stage for a like-for-like view. Bounds, physical scope and reporting dates still differ; this is not an additive capacity total.

AirTrunk JHB1 Data Center CampusSite · Connected record
Johor Bahru, Johor, Malaysia
AirTrunkTenaga Nasional Berhad
Partially operational
150 MW
Basis: Basis not specifiedPlanned / design
AirTrunk
Oct 28, 2026
AirTrunk JHB2 Data Center CampusSite · Connected record
Johor Bahru, Johor, Malaysia
AirTrunkInternational Finance Corporation
Construction
270 MW
Basis: Basis not specifiedPlanned / design
AirTrunk
Oct 28, 2026
AirTrunk JHB3 Data Center CampusSite · Connected record
Johor Bahru, Johor, Malaysia
AirTrunkTenaga Nasional Berhad
Status under review
280 MW
Basis: Basis not specifiedPlanned / design
AirTrunk
Oct 28, 2026
AirTrunk JHB4 Data Center CampusSite · Connected record
Johor Bahru, Johor, Malaysia
AirTrunkTenaga Nasional Berhad
Status under review
142 MW
Basis: Critical ITPlanned critical IT
AirTrunk
Oct 28, 2026
STACK JHB01 Iskandar Puteri Data Center CampusSite · Connected record
Iskandar Puteri, Johor, Malaysia
STACK InfrastructureTenaga Nasional Berhad
Construction
220 MW
Basis: Critical ITPlanned critical IT
STACK Infrastructure
Oct 28, 2026
Vantage KUL1 Cyberjaya Data Center CampusSite · Connected record
Cyberjaya, Selangor, Malaysia
Tenaga Nasional BerhadVantage Data Centers
Operating
31 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage KUL2 CyberjayaSite · Connected record
Cyberjaya, Selangor, SGR, Malaysia
Tenaga Nasional BerhadVantage Data Centers
Construction
436 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026

Every figure carries its capacity stage. Operating, contracted, planned/design and utility-service values remain distinct; generation is never used as site capacity. A missing figure does not mean zero; other scoped figures may appear in the profile.