Data center siteSite record

Stargate Abilene

Abilene, Texas, United StatesOperating / Stabilized
Capacity
1,200 MW
Planned / design
Lead participant
Crusoe
Contractor · Developer · Operator
Last updated
Aug 18, 2026
Most recent public record update

About Stargate Abilene

Stargate Abilene is the first operating campus in OpenAI’s U.S. Stargate infrastructure program. Developed and operated by Crusoe at Lancium’s Abilene Clean Campus, the project runs on Oracle Cloud Infrastructure and supports OpenAI training and inference workloads. Its first two buildings were energized in 2025; six more are under construction, bringing the planned campus to approximately 4 million square feet and 1.2 GW.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Design1,200 MWDesign · Stargate Abilene
Design206 MWTransaction Scope · Initial two-building phase
Utility Service1,200 MWProposal · Stargate Abilene
Onsite Generation360.5 MWPermitted · Stargate Abilene

Development

3 phases · 2 milestones
Initial two-building phaseOperational

206 MW and 998,000 square feet in financing documents.

2 buildings

Six-building expansionUnder Construction

Balance of original campus toward approximately 4 million square feet and 1.2 GW.

6 buildings

Former nearby Oracle/OpenAI expansion proposalChanged Or Cancelled

Historical 600-MW expansion concept; not current Stargate or Microsoft campus capacity.

Jun 30, 2026
Completion Forecast
Day
Dec 31, 2026
Completion Forecast
Forecast

Infrastructure

Electric GridApproved And Partially Energized

1.2 GW interconnection

Formal ERCOT record remains a P1 research item; not operating load.

Onsite Natural Gas GenerationPermitted Or Installed

360.5 MW nameplate

Ten simple-cycle turbines; generation nameplate is not campus IT load.

Closed Loop CoolingPartially Operational

Initial fill and routine maintenance water remain distinct.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
2

No map point available

Power & interconnection: 1Generation & storage: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

20 facts
Planned Campus Power Capacity
1.2 GW
Design
Power Capacity
206 MW
Transaction Scope
Grid Interconnection Capacity
1.2 GW
Proposal
Onsite Gas Generation Nameplate
360.5 MW
Permitted
Onsite Generation Role
Backup and reliability
Fact

Sources report a conflicting figure.

Onsite Generation Role
Onsite primary and backup use with extensive permitted annual operation
Permitted
Planned Building Count
8
Design
Operational Building Count
2
Actual
Planned Gross Building Area
4 million sq. ft.
Design
Gross Building Area
998,000 sq. ft.
Transaction Scope
Site Area
1,100 acres
Reported Rounded
Initial Water Fill Per Building
1,000,000 gallons
Reported Rounded
Routine Cooling Water Per Building Per Year
50,000 gallons
Fact

Sources report a conflicting figure.

Routine Cooling Water Per Building Per Year
12,625 gallons
Fact
Cooling System
Closed loop non evaporative liquid cooling with air cooled chillers; direct to chip capable
Design
Completion Forecast
2026-12-31
Forecast
Financing Amount
$3,400,000,000
Closed Financing
Lancium Debt Package
$600,000,000
Closed Financing
Local Property Tax Abatement Rate
85 percent
Transaction Scope
Local Property Tax Abatement Term
10 years
Transaction Scope