Cartis diligence evidence schedule
Stargate Abilene
PRJ-0004 · Site · Abilene, Texas, United States
Record last updated Oct 28, 2026
Scope and capacity
Stargate Abilene is the first operating campus in OpenAI’s U.S. Stargate infrastructure program. Developed and operated by Crusoe at Lancium’s Abilene Clean Campus, the project runs on Oracle Cloud Infrastructure and supports OpenAI training and inference workloads. Its first two buildings were energized in 2025; six more are under construction, bringing the planned campus to approximately 4 million square feet and 1.2 GW.
Headline: 1,200 MW Planned / design
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Jump to a claim (20)
Planned campus power capacity · 1.2 GW
Planned / design or future potential · Stargate Abilene (Project)
Claim 294 · Recorded claim type: Design · Review: Approved · Claim date: Mar 18, 2025
Headline treatment: Selected headline
- Crusoe expands Abilene campus to 1.2 GW
Crusoe · Document date: Mar 18, 2025 · Primary
Source reference: SRC-0009 · Company announcement · Recorded authority: Party primary
Source URL
https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts
https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts
Power capacity · 206 MW
Planned / design or future potential · Initial two-building phase (Phase)
Claim 295 · Recorded claim type: Transaction scope · Review: Approved · Claim date: Oct 15, 2024
Headline treatment: Phase scope; not a whole-site figure
- Lancium — $3.4B Crusoe/Blue Owl/Primary Digital JV
Lancium · Document date: Oct 15, 2024 · Primary
Source reference: SRC-0006 · Company announcement · Recorded authority: Party primary
Source URL
https://lancium.com/2024/10/15/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-3-4-billion-joint-venture-for-ai-data-center-development/
https://lancium.com/2024/10/15/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-3-4-billion-joint-venture-for-ai-data-center-development/
Grid interconnection capacity · 1.2 GW
Proposal · Stargate Abilene (Project)
Claim 297 · Recorded claim type: Proposal · Review: Approved · Claim date: Not stated
Headline treatment: Separate claim, not added to the headline
- Abilene campus/interconnection page
Lancium · Document date: Not stated · Primary
Source reference: SRC-0016 · Company announcement · Recorded authority: Party primary
Source URL
https://lancium.com/locations/
https://lancium.com/locations/
Onsite gas generation nameplate · 360.5 MW
Permitted · Stargate Abilene (Project)
Claim 298 · Recorded claim type: Permitted · Review: Approved · Claim date: Jan 1, 2025
Headline treatment: Generation capacity; not IT capacity
- Longhorn Data Center electric generating unit technical review
Texas Commission on Environmental Quality · Document date: Jan 1, 2025 · Primary
Source reference: SRC-0008 · Government record · Recorded authority: Official primary
Source URL
https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&Rendition=Web&dID=8600163
https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&Rendition=Web&dID=8600163
Onsite generation role · Backup and reliability
Source report · Stargate Abilene (Project)
Claim 299 · Recorded claim type: Not stated · Review: Approved with conflict · Claim date: Aug 5, 2025
Conflicting public evidence is preserved.
- An inside look at the Abilene AI data center
Crusoe · Document date: Aug 5, 2025 · Primary
Source reference: SRC-0010 · Company announcement · Recorded authority: Party primary
Source URL
https://www.crusoe.ai/resources/blog/an-inside-look-at-the-abilene-ai-data-center
https://www.crusoe.ai/resources/blog/an-inside-look-at-the-abilene-ai-data-center
Onsite generation role · Onsite primary and backup use with extensive permitted annual operation
Permitted · Stargate Abilene (Project)
Claim 300 · Recorded claim type: Permitted · Review: Approved with conflict · Claim date: Jan 1, 2025
Conflicting public evidence is preserved.
- Longhorn Data Center electric generating unit technical review
Texas Commission on Environmental Quality · Document date: Jan 1, 2025 · Primary
Source reference: SRC-0008 · Government record · Recorded authority: Official primary
Source URL
https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&Rendition=Web&dID=8600163
https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&Rendition=Web&dID=8600163
Planned building count · 8 buildings
Design · Stargate Abilene (Project)
Claim 301 · Recorded claim type: Design · Review: Approved · Claim date: Mar 18, 2025
- Crusoe expands Abilene campus to 1.2 GW
Crusoe · Document date: Mar 18, 2025 · Primary
Source reference: SRC-0009 · Company announcement · Recorded authority: Party primary
Source URL
https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts
https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts
Operational building count · 2 buildings
Actual · Stargate Abilene (Project)
Claim 302 · Recorded claim type: Actual · Review: Approved · Claim date: Sep 30, 2025
- Crusoe announces flagship Abilene data center is live
Crusoe · Document date: Sep 30, 2025 · Primary
Source reference: SRC-0014 · Company announcement · Recorded authority: Party primary
Source URL
https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live
https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live
Planned gross building area · 4 million sq. ft.
Design · Stargate Abilene (Project)
Claim 303 · Recorded claim type: Design · Review: Approved · Claim date: Mar 18, 2025
- Crusoe expands Abilene campus to 1.2 GW
Crusoe · Document date: Mar 18, 2025 · Primary
Source reference: SRC-0009 · Company announcement · Recorded authority: Party primary
Source URL
https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts
https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts
Gross building area · 998,000 sq. ft.
Transaction scope · Initial two-building phase (Phase)
Claim 304 · Recorded claim type: Transaction scope · Review: Approved · Claim date: Oct 15, 2024
- Lancium — $3.4B Crusoe/Blue Owl/Primary Digital JV
Lancium · Document date: Oct 15, 2024 · Primary
Source reference: SRC-0006 · Company announcement · Recorded authority: Party primary
Source URL
https://lancium.com/2024/10/15/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-3-4-billion-joint-venture-for-ai-data-center-development/
https://lancium.com/2024/10/15/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-3-4-billion-joint-venture-for-ai-data-center-development/
Site area · 1,100 acres
Reported rounded · Stargate Abilene (Project)
Claim 305 · Recorded claim type: Reported rounded · Review: Approved · Claim date: Sep 23, 2025
- Oracle AI data center fact sheet
Oracle / Office of Rep. Jodey Arrington · Document date: Sep 23, 2025 · Primary
Source reference: SRC-0013 · Fact sheet · Recorded authority: Secondary
Source URL
https://arrington.house.gov/uploadedfiles/final_oracle_oai_data_center_fact_sheet_092225b.pdf
https://arrington.house.gov/uploadedfiles/final_oracle_oai_data_center_fact_sheet_092225b.pdf
Initial water fill per building · 1,000,000 gallons
Reported rounded · Stargate Abilene (Project)
Claim 306 · Recorded claim type: Reported rounded · Review: Approved · Claim date: Aug 5, 2025
- An inside look at the Abilene AI data center
Crusoe · Document date: Aug 5, 2025 · Primary
Source reference: SRC-0010 · Company announcement · Recorded authority: Party primary
Source URL
https://www.crusoe.ai/resources/blog/an-inside-look-at-the-abilene-ai-data-center
https://www.crusoe.ai/resources/blog/an-inside-look-at-the-abilene-ai-data-center
Routine cooling water per building per year · 50,000 gallons
Source report · Stargate Abilene (Project)
Claim 307 · Recorded claim type: Not stated · Review: Approved with conflict · Claim date: Aug 5, 2025
Conflicting public evidence is preserved.
- An inside look at the Abilene AI data center
Crusoe · Document date: Aug 5, 2025 · Primary
Source reference: SRC-0010 · Company announcement · Recorded authority: Party primary
Source URL
https://www.crusoe.ai/resources/blog/an-inside-look-at-the-abilene-ai-data-center
https://www.crusoe.ai/resources/blog/an-inside-look-at-the-abilene-ai-data-center
Routine cooling water per building per year · 12,625 gallons
Source report · Stargate Abilene (Project)
Claim 308 · Recorded claim type: Not stated · Review: Approved with conflict · Claim date: Sep 23, 2025
Conflicting public evidence is preserved.
- Oracle AI data center fact sheet
Oracle / Office of Rep. Jodey Arrington · Document date: Sep 23, 2025 · Primary
Source reference: SRC-0013 · Fact sheet · Recorded authority: Secondary
Source URL
https://arrington.house.gov/uploadedfiles/final_oracle_oai_data_center_fact_sheet_092225b.pdf
https://arrington.house.gov/uploadedfiles/final_oracle_oai_data_center_fact_sheet_092225b.pdf
Cooling system · Closed loop non evaporative liquid cooling with air cooled chillers; direct to chip capable
Design · Stargate Abilene (Project)
Claim 309 · Recorded claim type: Design · Review: Approved · Claim date: Aug 5, 2025
- An inside look at the Abilene AI data center
Crusoe · Document date: Aug 5, 2025 · Primary
Source reference: SRC-0010 · Company announcement · Recorded authority: Party primary
Source URL
https://www.crusoe.ai/resources/blog/an-inside-look-at-the-abilene-ai-data-center
https://www.crusoe.ai/resources/blog/an-inside-look-at-the-abilene-ai-data-center
Completion forecast · end of 2026
Forecast · Stargate Abilene (Project)
Claim 311 · Recorded claim type: Forecast · Review: Approved · Claim date: Mar 27, 2026
- Crusoe announces new 900 MW Microsoft AI campus in Abilene
Crusoe · Document date: Mar 27, 2026 · Primary
Source reference: SRC-0017 · Company announcement · Recorded authority: Party primary
Source URL
https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure
https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure
Financing amount · $3,400,000,000
Closed financing · Initial two-building phase (Phase)
Claim 312 · Recorded claim type: Closed financing · Review: Approved · Claim date: Oct 15, 2024
- Lancium — $3.4B Crusoe/Blue Owl/Primary Digital JV
Lancium · Document date: Oct 15, 2024 · Primary
Source reference: SRC-0006 · Company announcement · Recorded authority: Party primary
Source URL
https://lancium.com/2024/10/15/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-3-4-billion-joint-venture-for-ai-data-center-development/
https://lancium.com/2024/10/15/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-3-4-billion-joint-venture-for-ai-data-center-development/
Lancium debt package · $600,000,000
Closed financing · Stargate Abilene (Project)
Claim 313 · Recorded claim type: Closed financing · Review: Approved · Claim date: Oct 16, 2025
- Lancium secures $600 million debt financing
Lancium · Document date: Oct 16, 2025 · Primary
Source reference: SRC-0015 · Company announcement · Recorded authority: Party primary
Source URL
https://lancium.com/2025/10/16/lancium-secures-600-million-debt-financing/
https://lancium.com/2025/10/16/lancium-secures-600-million-debt-financing/
Local property tax abatement rate · 85 percent
Transaction scope · Stargate Abilene (Project)
Claim 314 · Recorded claim type: Transaction scope · Review: Approved · Claim date: Aug 1, 2025
- Tax-abatement agenda summary
City of Abilene · Document date: Aug 1, 2025 · Primary
Source reference: SRC-0011 · Government record · Recorded authority: Official primary
Source URL
https://abilenetx.gov/CivicSend/ViewMessage/message/268849
https://abilenetx.gov/CivicSend/ViewMessage/message/268849
Local property tax abatement term · 10 years
Transaction scope · Stargate Abilene (Project)
Claim 315 · Recorded claim type: Transaction scope · Review: Approved · Claim date: Aug 1, 2025
- Tax-abatement agenda summary
City of Abilene · Document date: Aug 1, 2025 · Primary
Source reference: SRC-0011 · Government record · Recorded authority: Official primary
Source URL
https://abilenetx.gov/CivicSend/ViewMessage/message/268849
https://abilenetx.gov/CivicSend/ViewMessage/message/268849
Counterparties and capital
Blue Owl Capital funds · Investor · CMP-0008
Crusoe · Contractor, Developer, Operator · CMP-0005
ERCOT · Operator · CMP-0016
GE Vernova · Supplier · CMP-0011
Lancium · Developer · CMP-0004
NVIDIA · Supplier · CMP-0010
OpenAI · Customer · CMP-0007
Oracle · Operator · CMP-0006
Primary Digital Infrastructure · Investor · CMP-0009
Solar Turbines · Supplier · CMP-0012
$3,400,000,000 · Oct 15, 2024
Initial two buildings, 206 MW, 998,000 square feet
Blue Owl Capital funds (Sponsor) · Crusoe (Joint venture partner) · Primary Digital Infrastructure (Adviser) · Primary Digital Infrastructure (Sponsor)
Sources (1)
- Lancium — $3.4B Crusoe/Blue Owl/Primary Digital JV · Oct 15, 2024
Financing record 1; claim-specific source links appear in the exhibit sources where published.
$600,000,000 · Oct 16, 2025
Lancium Clean Campus strategy beginning with Abilene; project allocation not fully disclosed
Cantor Fitzgerald (Adviser) · Lancium (Borrower) · Santander (Adviser) · Santander (Arranger)
Sources (1)
- Lancium secures $600 million debt financing · Oct 16, 2025
Financing record 2; claim-specific source links appear in the exhibit sources where published.
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed.