Skip to content
← Return to profile

Cartis diligence evidence schedule

Stargate Abilene

PRJ-0004 · Site · Abilene, Texas, United States

Captured 2026-09-06T04:12:13.084Z · Record last updated 2026-08-18

SHA-256: 25585ed2c3ccd93a71e46987a7efafceecac8a16820f9c4843bc6a194e7dd0b2

Save a diligence baseline

Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.

The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.

Scope and capacity

Stargate Abilene is the first operating campus in OpenAI’s U.S. Stargate infrastructure program. Developed and operated by Crusoe at Lancium’s Abilene Clean Campus, the project runs on Oracle Cloud Infrastructure and supports OpenAI training and inference workloads. Its first two buildings were energized in 2025; six more are under construction, bringing the planned campus to approximately 4 million square feet and 1.2 GW.

Headline: 1,200 MW Planned / design

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Planned Campus Power Capacity · 1.2 GW

Planned / design or future potential · Stargate Abilene (project)

Claim 294 · Review: Approved · Claim date: 2025-03-18T00:00:00+00:00

Headline treatment: Selected headline

  1. Crusoe expands Abilene campus to 1.2 GW

    Crusoe · Document date: 2025-03-18 · Primary

    https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts

Power Capacity · 206 MW

Planned / design or future potential · Initial two-building phase (phase)

Claim 295 · Review: Approved · Claim date: 2024-10-15T00:00:00+00:00

Headline treatment: Phase scope; not a whole-site figure

  1. Lancium — $3.4B Crusoe/Blue Owl/Primary Digital JV

    Lancium · Document date: 2024-10-15 · Primary

    https://lancium.com/2024/10/15/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-3-4-billion-joint-venture-for-ai-data-center-development/

Grid Interconnection Capacity · 1.2 GW

proposal · Stargate Abilene (project)

Claim 297 · Review: Approved · Claim date: Not published

Headline treatment: Separate claim, not added to the headline

  1. Abilene campus/interconnection page

    Lancium · Document date: Not published · Primary

    https://lancium.com/locations/

Onsite Gas Generation Nameplate · 360.5 MW

permitted · Stargate Abilene (project)

Claim 298 · Review: Approved · Claim date: 2025-01-01T00:00:00+00:00

Headline treatment: Generation capacity; not IT capacity

  1. Longhorn Data Center electric generating unit technical review

    Texas Commission on Environmental Quality · Document date: 2025-01-01 · Primary

    https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&Rendition=Web&dID=8600163

Onsite Generation Role · Backup and reliability

Source report · Stargate Abilene (project)

Claim 299 · Review: Approved With Conflict · Claim date: 2025-08-05T00:00:00+00:00

Conflicting public evidence is preserved.

  1. An inside look at the Abilene AI data center

    Crusoe · Document date: 2025-08-05 · Primary

    https://www.crusoe.ai/resources/blog/an-inside-look-at-the-abilene-ai-data-center

Onsite Generation Role · Onsite primary and backup use with extensive permitted annual operation

permitted · Stargate Abilene (project)

Claim 300 · Review: Approved With Conflict · Claim date: 2025-01-01T00:00:00+00:00

Conflicting public evidence is preserved.

  1. Longhorn Data Center electric generating unit technical review

    Texas Commission on Environmental Quality · Document date: 2025-01-01 · Primary

    https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&Rendition=Web&dID=8600163

Planned Building Count · 8

Planned / design or future potential · Stargate Abilene (project)

Claim 301 · Review: Approved · Claim date: 2025-03-18T00:00:00+00:00

  1. Crusoe expands Abilene campus to 1.2 GW

    Crusoe · Document date: 2025-03-18 · Primary

    https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts

Operational Building Count · 2

actual · Stargate Abilene (project)

Claim 302 · Review: Approved · Claim date: 2025-09-30T00:00:00+00:00

  1. Crusoe announces flagship Abilene data center is live

    Crusoe · Document date: 2025-09-30 · Primary

    https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live

Planned Gross Building Area · 4 million sq. ft.

Planned / design or future potential · Stargate Abilene (project)

Claim 303 · Review: Approved · Claim date: 2025-03-18T00:00:00+00:00

  1. Crusoe expands Abilene campus to 1.2 GW

    Crusoe · Document date: 2025-03-18 · Primary

    https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts

Gross Building Area · 998,000 sq. ft.

transaction scope · Initial two-building phase (phase)

Claim 304 · Review: Approved · Claim date: 2024-10-15T00:00:00+00:00

  1. Lancium — $3.4B Crusoe/Blue Owl/Primary Digital JV

    Lancium · Document date: 2024-10-15 · Primary

    https://lancium.com/2024/10/15/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-3-4-billion-joint-venture-for-ai-data-center-development/

Site Area · 1,100 acres

reported rounded · Stargate Abilene (project)

Claim 305 · Review: Approved · Claim date: 2025-09-23T00:00:00+00:00

  1. Oracle AI data center fact sheet

    Oracle / Office of Rep. Jodey Arrington · Document date: 2025-09-23 · Primary

    https://arrington.house.gov/uploadedfiles/final_oracle_oai_data_center_fact_sheet_092225b.pdf

Initial Water Fill Per Building · 1,000,000 gallons

reported rounded · Stargate Abilene (project)

Claim 306 · Review: Approved · Claim date: 2025-08-05T00:00:00+00:00

  1. An inside look at the Abilene AI data center

    Crusoe · Document date: 2025-08-05 · Primary

    https://www.crusoe.ai/resources/blog/an-inside-look-at-the-abilene-ai-data-center

Routine Cooling Water Per Building Per Year · 50,000 gallons

Source report · Stargate Abilene (project)

Claim 307 · Review: Approved With Conflict · Claim date: 2025-08-05T00:00:00+00:00

Conflicting public evidence is preserved.

  1. An inside look at the Abilene AI data center

    Crusoe · Document date: 2025-08-05 · Primary

    https://www.crusoe.ai/resources/blog/an-inside-look-at-the-abilene-ai-data-center

Routine Cooling Water Per Building Per Year · 12,625 gallons

Source report · Stargate Abilene (project)

Claim 308 · Review: Approved With Conflict · Claim date: 2025-09-23T00:00:00+00:00

Conflicting public evidence is preserved.

  1. Oracle AI data center fact sheet

    Oracle / Office of Rep. Jodey Arrington · Document date: 2025-09-23 · Primary

    https://arrington.house.gov/uploadedfiles/final_oracle_oai_data_center_fact_sheet_092225b.pdf

Cooling System · Closed loop non evaporative liquid cooling with air cooled chillers; direct to chip capable

design · Stargate Abilene (project)

Claim 309 · Review: Approved · Claim date: 2025-08-05T00:00:00+00:00

  1. An inside look at the Abilene AI data center

    Crusoe · Document date: 2025-08-05 · Primary

    https://www.crusoe.ai/resources/blog/an-inside-look-at-the-abilene-ai-data-center

Completion Forecast · 2026-12-31

forecast · Stargate Abilene (project)

Claim 311 · Review: Approved · Claim date: 2026-03-27T00:00:00+00:00 · Supersedes 310

  1. Crusoe announces new 900 MW Microsoft AI campus in Abilene

    Crusoe · Document date: 2026-03-27 · Primary

    https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure

Financing Amount · $3,400,000,000

closed financing · Initial two-building phase (phase)

Claim 312 · Review: Approved · Claim date: 2024-10-15T00:00:00+00:00

  1. Lancium — $3.4B Crusoe/Blue Owl/Primary Digital JV

    Lancium · Document date: 2024-10-15 · Primary

    https://lancium.com/2024/10/15/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-3-4-billion-joint-venture-for-ai-data-center-development/

Lancium Debt Package · $600,000,000

closed financing · Stargate Abilene (project)

Claim 313 · Review: Approved · Claim date: 2025-10-16T00:00:00+00:00

  1. Lancium secures $600 million debt financing

    Lancium · Document date: 2025-10-16 · Primary

    https://lancium.com/2025/10/16/lancium-secures-600-million-debt-financing/

Local Property Tax Abatement Rate · 85 percent

transaction scope · Stargate Abilene (project)

Claim 314 · Review: Approved · Claim date: 2025-08-01T00:00:00+00:00

  1. Tax-abatement agenda summary

    City of Abilene · Document date: 2025-08-01 · Primary

    https://abilenetx.gov/CivicSend/ViewMessage/message/268849

Local Property Tax Abatement Term · 10 years

transaction scope · Stargate Abilene (project)

Claim 315 · Review: Approved · Claim date: 2025-08-01T00:00:00+00:00

  1. Tax-abatement agenda summary

    City of Abilene · Document date: 2025-08-01 · Primary

    https://abilenetx.gov/CivicSend/ViewMessage/message/268849

Counterparties and capital

Blue Owl Capital funds · Investor · CMP-0008

Crusoe · Contractor, Developer, Operator · CMP-0005

ERCOT · Operator · CMP-0016

GE Vernova · Supplier · CMP-0011

Lancium · Developer · CMP-0004

NVIDIA · Supplier · CMP-0010

OpenAI · Customer · CMP-0007

Oracle · Operator · CMP-0006

Primary Digital Infrastructure · Investor · CMP-0009

Solar Turbines · Supplier · CMP-0012

Forward Takeout

$3,400,000,000 · 2024-10-15

Initial two buildings, 206 MW, 998,000 square feet

Blue Owl Capital funds (Sponsor) · Crusoe (Joint Venture Partner) · Primary Digital Infrastructure (Adviser) · Primary Digital Infrastructure (Sponsor)

Financing record 1; claim-specific source links appear in the exhibit sources where published.

Debt Financing

$600,000,000 · 2025-10-16

Lancium Clean Campus strategy beginning with Abilene; project allocation not fully disclosed

Cantor Fitzgerald (Adviser) · Lancium (Borrower) · Santander (Adviser) · Santander (Arranger)

Financing record 2; claim-specific source links appear in the exhibit sources where published.

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.