Cartis diligence evidence schedule
Stargate Abilene
PRJ-0004 · Site · Abilene, Texas, United States
Captured 2026-09-06T04:12:13.084Z · Record last updated 2026-08-18
SHA-256: 25585ed2c3ccd93a71e46987a7efafceecac8a16820f9c4843bc6a194e7dd0b2
Save a diligence baseline
Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.
The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.
Scope and capacity
Stargate Abilene is the first operating campus in OpenAI’s U.S. Stargate infrastructure program. Developed and operated by Crusoe at Lancium’s Abilene Clean Campus, the project runs on Oracle Cloud Infrastructure and supports OpenAI training and inference workloads. Its first two buildings were energized in 2025; six more are under construction, bringing the planned campus to approximately 4 million square feet and 1.2 GW.
Headline: 1,200 MW Planned / design
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Planned Campus Power Capacity · 1.2 GW
Planned / design or future potential · Stargate Abilene (project)
Claim 294 · Review: Approved · Claim date: 2025-03-18T00:00:00+00:00
Headline treatment: Selected headline
- Crusoe expands Abilene campus to 1.2 GW
Crusoe · Document date: 2025-03-18 · Primary
https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts
Power Capacity · 206 MW
Planned / design or future potential · Initial two-building phase (phase)
Claim 295 · Review: Approved · Claim date: 2024-10-15T00:00:00+00:00
Headline treatment: Phase scope; not a whole-site figure
- Lancium — $3.4B Crusoe/Blue Owl/Primary Digital JV
Lancium · Document date: 2024-10-15 · Primary
https://lancium.com/2024/10/15/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-3-4-billion-joint-venture-for-ai-data-center-development/
Grid Interconnection Capacity · 1.2 GW
proposal · Stargate Abilene (project)
Claim 297 · Review: Approved · Claim date: Not published
Headline treatment: Separate claim, not added to the headline
- Abilene campus/interconnection page
Lancium · Document date: Not published · Primary
https://lancium.com/locations/
Onsite Gas Generation Nameplate · 360.5 MW
permitted · Stargate Abilene (project)
Claim 298 · Review: Approved · Claim date: 2025-01-01T00:00:00+00:00
Headline treatment: Generation capacity; not IT capacity
- Longhorn Data Center electric generating unit technical review
Texas Commission on Environmental Quality · Document date: 2025-01-01 · Primary
https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&Rendition=Web&dID=8600163
Onsite Generation Role · Backup and reliability
Source report · Stargate Abilene (project)
Claim 299 · Review: Approved With Conflict · Claim date: 2025-08-05T00:00:00+00:00
Conflicting public evidence is preserved.
- An inside look at the Abilene AI data center
Crusoe · Document date: 2025-08-05 · Primary
https://www.crusoe.ai/resources/blog/an-inside-look-at-the-abilene-ai-data-center
Onsite Generation Role · Onsite primary and backup use with extensive permitted annual operation
permitted · Stargate Abilene (project)
Claim 300 · Review: Approved With Conflict · Claim date: 2025-01-01T00:00:00+00:00
Conflicting public evidence is preserved.
- Longhorn Data Center electric generating unit technical review
Texas Commission on Environmental Quality · Document date: 2025-01-01 · Primary
https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&Rendition=Web&dID=8600163
Planned Building Count · 8
Planned / design or future potential · Stargate Abilene (project)
Claim 301 · Review: Approved · Claim date: 2025-03-18T00:00:00+00:00
- Crusoe expands Abilene campus to 1.2 GW
Crusoe · Document date: 2025-03-18 · Primary
https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts
Operational Building Count · 2
actual · Stargate Abilene (project)
Claim 302 · Review: Approved · Claim date: 2025-09-30T00:00:00+00:00
- Crusoe announces flagship Abilene data center is live
Crusoe · Document date: 2025-09-30 · Primary
https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live
Planned Gross Building Area · 4 million sq. ft.
Planned / design or future potential · Stargate Abilene (project)
Claim 303 · Review: Approved · Claim date: 2025-03-18T00:00:00+00:00
- Crusoe expands Abilene campus to 1.2 GW
Crusoe · Document date: 2025-03-18 · Primary
https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts
Gross Building Area · 998,000 sq. ft.
transaction scope · Initial two-building phase (phase)
Claim 304 · Review: Approved · Claim date: 2024-10-15T00:00:00+00:00
- Lancium — $3.4B Crusoe/Blue Owl/Primary Digital JV
Lancium · Document date: 2024-10-15 · Primary
https://lancium.com/2024/10/15/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-3-4-billion-joint-venture-for-ai-data-center-development/
Site Area · 1,100 acres
reported rounded · Stargate Abilene (project)
Claim 305 · Review: Approved · Claim date: 2025-09-23T00:00:00+00:00
- Oracle AI data center fact sheet
Oracle / Office of Rep. Jodey Arrington · Document date: 2025-09-23 · Primary
https://arrington.house.gov/uploadedfiles/final_oracle_oai_data_center_fact_sheet_092225b.pdf
Initial Water Fill Per Building · 1,000,000 gallons
reported rounded · Stargate Abilene (project)
Claim 306 · Review: Approved · Claim date: 2025-08-05T00:00:00+00:00
- An inside look at the Abilene AI data center
Crusoe · Document date: 2025-08-05 · Primary
https://www.crusoe.ai/resources/blog/an-inside-look-at-the-abilene-ai-data-center
Routine Cooling Water Per Building Per Year · 50,000 gallons
Source report · Stargate Abilene (project)
Claim 307 · Review: Approved With Conflict · Claim date: 2025-08-05T00:00:00+00:00
Conflicting public evidence is preserved.
- An inside look at the Abilene AI data center
Crusoe · Document date: 2025-08-05 · Primary
https://www.crusoe.ai/resources/blog/an-inside-look-at-the-abilene-ai-data-center
Routine Cooling Water Per Building Per Year · 12,625 gallons
Source report · Stargate Abilene (project)
Claim 308 · Review: Approved With Conflict · Claim date: 2025-09-23T00:00:00+00:00
Conflicting public evidence is preserved.
- Oracle AI data center fact sheet
Oracle / Office of Rep. Jodey Arrington · Document date: 2025-09-23 · Primary
https://arrington.house.gov/uploadedfiles/final_oracle_oai_data_center_fact_sheet_092225b.pdf
Cooling System · Closed loop non evaporative liquid cooling with air cooled chillers; direct to chip capable
design · Stargate Abilene (project)
Claim 309 · Review: Approved · Claim date: 2025-08-05T00:00:00+00:00
- An inside look at the Abilene AI data center
Crusoe · Document date: 2025-08-05 · Primary
https://www.crusoe.ai/resources/blog/an-inside-look-at-the-abilene-ai-data-center
Completion Forecast · 2026-12-31
forecast · Stargate Abilene (project)
Claim 311 · Review: Approved · Claim date: 2026-03-27T00:00:00+00:00 · Supersedes 310
- Crusoe announces new 900 MW Microsoft AI campus in Abilene
Crusoe · Document date: 2026-03-27 · Primary
https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure
Financing Amount · $3,400,000,000
closed financing · Initial two-building phase (phase)
Claim 312 · Review: Approved · Claim date: 2024-10-15T00:00:00+00:00
- Lancium — $3.4B Crusoe/Blue Owl/Primary Digital JV
Lancium · Document date: 2024-10-15 · Primary
https://lancium.com/2024/10/15/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-3-4-billion-joint-venture-for-ai-data-center-development/
Lancium Debt Package · $600,000,000
closed financing · Stargate Abilene (project)
Claim 313 · Review: Approved · Claim date: 2025-10-16T00:00:00+00:00
- Lancium secures $600 million debt financing
Lancium · Document date: 2025-10-16 · Primary
https://lancium.com/2025/10/16/lancium-secures-600-million-debt-financing/
Local Property Tax Abatement Rate · 85 percent
transaction scope · Stargate Abilene (project)
Claim 314 · Review: Approved · Claim date: 2025-08-01T00:00:00+00:00
- Tax-abatement agenda summary
City of Abilene · Document date: 2025-08-01 · Primary
https://abilenetx.gov/CivicSend/ViewMessage/message/268849
Local Property Tax Abatement Term · 10 years
transaction scope · Stargate Abilene (project)
Claim 315 · Review: Approved · Claim date: 2025-08-01T00:00:00+00:00
- Tax-abatement agenda summary
City of Abilene · Document date: 2025-08-01 · Primary
https://abilenetx.gov/CivicSend/ViewMessage/message/268849
Counterparties and capital
Blue Owl Capital funds · Investor · CMP-0008
Crusoe · Contractor, Developer, Operator · CMP-0005
ERCOT · Operator · CMP-0016
GE Vernova · Supplier · CMP-0011
Lancium · Developer · CMP-0004
NVIDIA · Supplier · CMP-0010
OpenAI · Customer · CMP-0007
Oracle · Operator · CMP-0006
Primary Digital Infrastructure · Investor · CMP-0009
Solar Turbines · Supplier · CMP-0012
$3,400,000,000 · 2024-10-15
Initial two buildings, 206 MW, 998,000 square feet
Blue Owl Capital funds (Sponsor) · Crusoe (Joint Venture Partner) · Primary Digital Infrastructure (Adviser) · Primary Digital Infrastructure (Sponsor)
Financing record 1; claim-specific source links appear in the exhibit sources where published.
$600,000,000 · 2025-10-16
Lancium Clean Campus strategy beginning with Abilene; project allocation not fully disclosed
Cantor Fitzgerald (Adviser) · Lancium (Borrower) · Santander (Adviser) · Santander (Arranger)
Financing record 2; claim-specific source links appear in the exhibit sources where published.
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.