Crusoe–Microsoft Abilene
About Crusoe–Microsoft Abilene
Crusoe announced a separate 900 MW, two-building Abilene campus for Microsoft in March 2026. The first building is forecast to energize in mid-2027; the design includes 900 MW of on-site generation, battery storage and two 336 MW IT-load buildings.
Related projects
Projects sharing a market, utility, or organization.
IREN Childress Horizon AI Data Center Campus
Under construction · Childress, Texas, United States
Microsoft San Antonio Data Center Campus
Operating / Stabilized · San Antonio, Texas, United States
Capacity
Planned / designDevelopment
1 phases · 0 milestonesSeparate 900 MW campus announced in March 2026.
2 buildings
Infrastructure
900 MW generation
Dedicated power plant and BESS support the new Microsoft campus; not an additional data center project.
Dedicated power plant and BESS support the new Microsoft campus; not an additional data center project.
Project map
0 of 1 project point mappedNo map point available
Facts & sources
Published claims and their source links.