Soluna Project Hedy AI Data Center Campus

Texas, United StatesProposed
Evidence
Headline capacity
Not established in published records
Updated
Oct 28, 2026

Soluna has designated Project Hedy for AI and HPC development with a 198 MW behind-the-meter power term sheet. The record remains early-stage pending site and customer milestones. Soluna Holdings is publicly identified in the project record for Texas location undisclosed, TX, US. The disclosed development record includes 198 MW behind-the-meter power term sheet; dedicated to AI and HPC development. Power and infrastructure include proposed behind-the-meter renewable-energy data center development. Soluna reports 198 MW of behind-the-meter power under a project term sheet. The available evidence does not establish a project-scoped operating or contracted capacity figure.

Capacity

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development programAnnounced or preconstruction

Project-wide phase for Soluna Project Hedy AI Data Center Campus; capacity remains classified as future potential.

Milestones (2)
Project Hedy project status and capacity disclosed

Aug 13, 2026 · Recorded actual event

Completed · Announced

Source not linked
Power-term-sheet stage for AI and HPC use

Date not disclosed · Forecast / planned record

Forecast · Forecast completion

Source not linked

Participants

Soluna Holdings

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Project Hedy | Texas | precise boundary undisclosed

Source

Development scale

Actual

198 MW behind the meter power term sheet

Source

Development milestone

Actual

Dedicated to AI and HPC development.

Source

Additional project facts

Lifecycle status

Actual

Proposed

Source

Material uncertainty

Actual

The 198 MW value is a term sheet stage power figure, not secured operating capacity.

Source

Boundary context

Actual

Project Hedy | Texas | precise boundary undisclosed

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

198 MW

Soluna reports 198 MW of behind-the-meter power under a project term sheet.

Site facility

Planned or represented

Proposed behind-the-meter renewable-energy data center development.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
Soluna Project Dorothy 3 AI Data Center Campus

Preconstruction · Silverton, Texas, United States

Shared developer: Soluna Holdings · Same market: Texas, United States

Compare in a collection
Soluna Project Ellen AI Data Center Campus

Proposed · Texas, United States

Shared developer: Soluna Holdings · Same market: Texas, United States

Compare in a collection
Soluna Project Fei AI Data Center Campus

Proposed · Texas, United States

Shared developer: Soluna Holdings · Same market: Texas, United States

Compare in a collection
Soluna Project Rosa AI Data Center Campus

Preconstruction · Snyder, Texas, United States

Shared developer: Soluna Holdings · Same market: Texas, United States

Compare in a collection