Soluna Project Dorothy 3 AI Data Center Campus
Preconstruction · Silverton, Texas, United States
Soluna has designated Project Hedy for AI and HPC development with a 198 MW behind-the-meter power term sheet. The record remains early-stage pending site and customer milestones. Soluna Holdings is publicly identified in the project record for Texas location undisclosed, TX, US. The disclosed development record includes 198 MW behind-the-meter power term sheet; dedicated to AI and HPC development. Power and infrastructure include proposed behind-the-meter renewable-energy data center development. Soluna reports 198 MW of behind-the-meter power under a project term sheet. The available evidence does not establish a project-scoped operating or contracted capacity figure.
Projects sharing a market, utility, or organization.
Preconstruction · Silverton, Texas, United States
Preconstruction · Snyder, Texas, United States
No additional capacity claims are published.
Project-wide phase for Soluna Project Hedy AI Data Center Campus; capacity remains classified as future potential.
198 MW
Soluna reports 198 MW of behind-the-meter power under a project term sheet.
Proposed behind-the-meter renewable-energy data center development.