Soluna Project Dorothy 3 AI Data Center Campus
Preconstruction · Silverton, Texas, United States
Soluna has designated Project Ellen for AI and HPC development with a 145 MW behind-the-meter power term sheet. Public project-level location detail remains limited. Soluna Holdings is publicly identified in the project record for Texas location undisclosed, TX, US. The disclosed development record includes 145 MW behind-the-meter power term sheet; dedicated to AI and HPC development. Power and infrastructure include proposed behind-the-meter renewable-energy data center development. Soluna reports 145 MW of behind-the-meter power under a project term sheet. The available evidence does not establish a project-scoped operating or contracted capacity figure.
Projects sharing a market, utility, or organization.
Preconstruction · Silverton, Texas, United States
Preconstruction · Snyder, Texas, United States
No additional capacity claims are published.
Project-wide phase for Soluna Project Ellen AI Data Center Campus; capacity remains classified as future potential.
145 MW
Soluna reports 145 MW of behind-the-meter power under a project term sheet.
Proposed behind-the-meter renewable-energy data center development.
No map point available
Published claims and their source links.