Soluna Project Dorothy 3 AI Data Center Campus

Silverton, Texas, United StatesPreconstruction
Capacity
300 MW
Planned / design
Lead participant
Soluna Holdings
Developer
Last updated
Aug 27, 2026
Most recent public record update

About Soluna Project Dorothy 3 AI Data Center Campus

Soluna is advancing Dorothy 3 as the next AI-focused phase at its Silverton campus beside the Briscoe Wind Farm. The company expanded the planned campus size to 300 MW. Soluna Holdings is publicly identified in the project record for Silverton, Briscoe County, TX, US. The disclosed development record includes 300 MW planned AI campus; adjacent to Soluna's operating Dorothy phases and 150 MW Briscoe Wind Farm. Power and infrastructure include renewable-adjacent data center campus using Soluna's generation-to-compute model. Soluna states that the Dorothy 3 campus expanded to 300 MW.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Design300 MWDesign · Soluna Project Dorothy 3 AI Data Center Campus

Development

1 phases · 2 milestones
Development programAnnounced Or Preconstruction

Project-wide phase for Soluna Project Dorothy 3 AI Data Center Campus; capacity remains classified as design.

Aug 13, 2026
Dorothy 3 project status and capacity disclosed
Completed
AI campus development and customer marketing
Forecast

Infrastructure

Electric GridPlanned Or Represented

300 MW

Soluna states that the Dorothy 3 campus expanded to 300 MW.

Site FacilityPlanned Or Represented

Renewable-adjacent data center campus using Soluna's generation-to-compute model.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

8 facts
Location Context
Project Dorothy campus | Silverton | Briscoe County | Texas
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
300 MW
Design
Capacity Basis
Soluna states that the Dorothy 3 campus expanded to 300 MW.
Actual
Development Scale
300 MW planned AI campus
Actual
Development Milestone
Adjacent to Soluna's operating Dorothy phases and 150 MW Briscoe Wind Farm.
Actual
Material Uncertainty
The 300 MW figure is planned development capacity and is not operating IT load.
Actual
Boundary Context
Project Dorothy campus | Silverton | Briscoe County | Texas
Actual