Soluna Project Dorothy 3 AI Data Center Campus
Preconstruction · Silverton, Texas, United States
Soluna has designated Project Fei for AI and HPC development with a 240 MW behind-the-meter power term sheet. The exact site boundary and customer commitments remain undisclosed. Soluna Holdings is publicly identified in the project record for Texas location undisclosed, TX, US. The disclosed development record includes 240 MW behind-the-meter power term sheet; dedicated to AI and HPC development. Power and infrastructure include proposed behind-the-meter renewable-energy data center development. Soluna reports 240 MW of behind-the-meter power under a project term sheet. The available evidence does not establish a project-scoped operating or contracted capacity figure.
Projects sharing a market, utility, or organization.
Preconstruction · Silverton, Texas, United States
Preconstruction · Snyder, Texas, United States
No additional capacity claims are published.
Project-wide phase for Soluna Project Fei AI Data Center Campus; capacity remains classified as future potential.
240 MW
Soluna reports 240 MW of behind-the-meter power under a project term sheet.
Proposed behind-the-meter renewable-energy data center development.
No map point available
Published claims and their source links.