Soluna Project Rosa AI Data Center Campus

Snyder, Texas, United StatesPreconstruction
Capacity
242 MW
Planned / design
Lead participant
Soluna Holdings
Developer
Last updated
Aug 27, 2026
Most recent public record update

About Soluna Project Rosa AI Data Center Campus

Soluna is designing Project Rosa as an AI and HPC campus co-located with a wind farm near Snyder. The plan has expanded to 242 MW, supported by power and land term sheets. Soluna Holdings is publicly identified in the project record for Snyder, Scurry County, TX, US. The disclosed development record includes 242 MW planned data center capacity; co-located with a 242 MW wind farm; design approximately 50% complete in the filing. Power and infrastructure include wind-adjacent development with planned behind-the-meter power and purpose-built AI infrastructure. Soluna reports an expanded 242 MW design for Project Rosa.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Design242 MWDesign · Soluna Project Rosa AI Data Center Campus

Development

1 phases · 2 milestones
Development programAnnounced Or Preconstruction

Project-wide phase for Soluna Project Rosa AI Data Center Campus; capacity remains classified as design.

Aug 14, 2026
Project Rosa project status and capacity disclosed
Completed
Design underway with power and land term sheets
Forecast

Infrastructure

Electric GridPlanned Or Represented

242 MW

Soluna reports an expanded 242 MW design for Project Rosa.

Site FacilityPlanned Or Represented

Wind-adjacent development with planned behind-the-meter power and purpose-built AI infrastructure.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

8 facts
Location Context
Project Rosa | Snyder | Scurry County | Texas
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
242 MW
Design
Capacity Basis
Soluna reports an expanded 242 MW design for Project Rosa.
Actual
Development Scale
242 MW planned data center capacity
Actual
Development Milestone
Co located with a 242 MW wind farm
Actual
Power Arrangement
Design approximately 50% complete in the filing.
Actual
Boundary Context
Project Rosa | Snyder | Scurry County | Texas
Actual