Prime Dallas DFW01 Data Center Campus

Dallas, Texas, United StatesPartially operational
Evidence
Planned critical IT
20 MW
Updated
Oct 28, 2026
Utility
Oncor

Prime Dallas DFW01 Data Center Campus, also known as Prime Dallas DFW01, is a data center project in Dallas, TX, US associated with Prime Data Centers. Two enterprise buildings; 213,000 square feet; 20 MW total critical IT load. Oncor-served Dallas campus with nearby substation, closed-loop cooling and multiple carriers. 8 MW is the operating DFW01-01 building design. A separate 12 MW building remains in construction, producing a 20 MW full-campus envelope. Disclosed investment or financing context is recorded with its transaction scope and is not treated as delivered project cost or proof of capacity.

Capacity

Reported capacity

Design

20 MW

Source

Reported capacity

Planned / design or future potential

8 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

8 MW is the operating DFW01-01 building design. A separate 12 MW building remains in construction, producing a 20 MW full-campus envelope.

Participants

Prime Data Centers

Developer

Sources by role
Developer (1)
Other participants (1)
Oncor

Utility provider

Sources by role
Utility provider (1)

Capital & incentives

Financing records

Equity investment

Amount not disclosed

Oct 14, 2025

Platform-level funding context; no site-level amount is inferred.

Parties & sources

Prime Data Centers (Borrower)

Site & development

Location context

Actual

Prime Dallas DFW01 | Dallas | TX | US

Source

Location context

Actual

Prime Dallas DFW01 | Dallas | TX | US

Source

Building area

Actual

213,000 square feet

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

Prime Data Centers publishes 20 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

8 MW is the operating DFW01-01 building design. A separate 12 MW building remains in construction, producing a 20 MW full campus envelope.

Source

Infrastructure & permits

Technical details (3)
Electric grid

Energized

Oncor-served Dallas campus with nearby substation, closed-loop cooling and multiple carriers.

Cooling system

Operational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Electric grid

Planned or represented

20 MW IT full build

8 MW operating building plus 12 MW construction building; Oncor service does not establish tenant utilization.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
Crow Holdings–CleanArc Stemmons Data Center Campus

Preconstruction · Dallas, Texas, United States

Same locality: Dallas

Compare in a collection
GridFree AI South Dallas One

Proposed · Dallas, Texas, United States

Same locality: Dallas

Compare in a collection
Aligned Plano DFW01–DFW02 Data Center Campus

Partially operational · Plano, Texas, United States

Shared participant: Oncor · Same market: Texas, United States

Compare in a collection
Prime Austin AUS01 Lockhart Data Center Campus

Preconstruction · Lockhart, Texas, United States

Shared participant: Prime Data Centers · Same market: Texas, United States

Compare in a collection