Dallas, Texas, United StatesProposed
Evidence
Planned / design
1,500 MW
Updated
Oct 28, 2026

South Dallas One is GridFree AI’s first announced grid-independent data center site in Hill County, Texas. GridFree says the individual site is designed for more than 1.5 GW, while the nearly 5 GW figure applies to a separate three-site regional cluster. The Cartis record therefore retains 1.5 GW as a future site boundary and does not transfer the cluster total onto this profile. Customer, permit, generation, water and construction details remain subject to future disclosure.

Capacity

Reported capacity

Planned / design or future potential

1,500 MW

Source

Reported capacity

Planned / design or future potential

1,500 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Site marketing and developmentAnnounced or preconstruction

South Dallas One is GridFree AI’s first announced grid-independent data center site in Hill County, Texas. GridFree says the individual site is designed for more than 1.5 GW, while the nearly 5 GW figure applies to a separate three-site regional cluster. The Cartis record therefore retains 1.5 GW as a future site boundary and does not transfer the cluster total onto this profile. Customer, permit, generation, water and construction details remain subject to future disclosure.

Milestones (1)
South Dallas One announced

Dec 30, 2025 · Recorded actual event

Completed · Announced

Source not linked

Participants

GridFree AI

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

GridFree AI South Dallas One | Dallas | Texas | US

Source

Location context

Actual

GridFree AI South Dallas One | Dallas | Texas | US

Source

Additional project facts

Lifecycle status

Actual

Proposed

Source

Capacity basis

Actual

1,500 MW future full build site capacity; not measured operating IT load. Corrected from a 5-GW cluster rollup to the separately scoped South Dallas One site boundary of more than 1.5 GW.

Source

Lifecycle status

Actual

Proposed

Source

Capacity basis

Actual

More than 1,500 MW is the site specific future design boundary; nearly 5,000 MW belongs to a three site cluster.

Source

Capacity correction

Actual

Cluster rollup excluded from site headline

Source

Infrastructure & permits

Technical details (1)
Onsite generation

Planned or represented

1,500 MW

Site-specific design boundary.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (2)
Crow Holdings–CleanArc Stemmons Data Center Campus

Preconstruction · Dallas, Texas, United States

Same locality: Dallas

Compare in a collection
Prime Dallas DFW01 Data Center Campus

Partially operational · Dallas, Texas, United States

Same locality: Dallas

Compare in a collection