Skip to content
← Return to profile

Cartis diligence evidence schedule

Prime Dallas DFW01 Data Center Campus

PRJ-0808 · Site · Dallas, Texas, United States

Captured 2026-09-06T04:13:20.759Z · Record last updated 2026-08-28

SHA-256: 7e034e43e7ee19d32ccfb1f1be72e48a38d8c6361cacbe06b64f4e587f51a7d2

Save a diligence baseline

Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.

The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.

Scope and capacity

Prime Dallas DFW01 Data Center Campus, also known as Prime Dallas DFW01, is a data center project in Dallas, TX, US associated with Prime Data Centers. Two enterprise buildings; 213,000 square feet; 20 MW total critical IT load. Oncor-served Dallas campus with nearby substation, closed-loop cooling and multiple carriers. 8 MW is the operating DFW01-01 building design. A separate 12 MW building remains in construction, producing a 20 MW full-campus envelope. Disclosed investment or financing context is recorded with its transaction scope and is not treated as delivered project cost or proof of capacity.

Headline: 20 MW Planned critical IT

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Location Context · Prime Dallas DFW01 | Dallas | TX | US

actual · Prime Dallas DFW01 Data Center Campus (project)

Claim 61104 · Review: Approved · Claim date: Not published

  1. Prime Data Centers Prime Dallas DFW01 profile

    Prime Data Centers · Document date: 2026-08-27 · Primary

    https://primedatacenters.com/locations/dallas/

Lifecycle Status · Partially operational

actual · Prime Dallas DFW01 Data Center Campus (project)

Claim 61105 · Review: Approved · Claim date: Not published

  1. Prime Data Centers Prime Dallas DFW01 profile

    Prime Data Centers · Document date: 2026-08-27 · Primary

    https://primedatacenters.com/locations/dallas/

Reported Capacity · 20 MW

design · Prime Dallas DFW01 Data Center Campus (project)

Claim 61106 · Review: Approved · Claim date: Not published

Headline treatment: Selected headline

  1. Prime Data Centers Prime Dallas DFW01 profile

    Prime Data Centers · Document date: 2026-08-27 · Primary

    https://primedatacenters.com/locations/dallas/

Capacity Basis · Prime Data Centers publishes 20 MW of critical IT capacity for this record boundary.

actual · Prime Dallas DFW01 Data Center Campus (project)

Claim 61107 · Review: Approved · Claim date: Not published

  1. Prime Data Centers Prime Dallas DFW01 profile

    Prime Data Centers · Document date: 2026-08-27 · Primary

    https://primedatacenters.com/locations/dallas/

Location Context · Prime Dallas DFW01 | Dallas | TX | US

actual · Prime Dallas DFW01 Data Center Campus (project)

Claim 101131 · Review: Approved · Claim date: Not published

  1. Prime Data Centers Prime Dallas DFW01 profile

    Prime Data Centers · Document date: 2026-08-27 · Primary

    https://primedatacenters.com/locations/dallas/

Lifecycle Status · Partially operational

actual · Prime Dallas DFW01 Data Center Campus (project)

Claim 101132 · Review: Approved · Claim date: Not published

  1. Prime Data Centers Prime Dallas DFW01 profile

    Prime Data Centers · Document date: 2026-08-27 · Primary

    https://primedatacenters.com/locations/dallas/

Reported Capacity · 8 MW

Planned / design or future potential · Prime Dallas DFW01 Data Center Campus (project)

Claim 101133 · Review: Approved · Claim date: Not published

Headline treatment: Separate claim, not added to the headline

  1. Prime Data Centers Prime Dallas DFW01 profile

    Prime Data Centers · Document date: 2026-08-27 · Primary

    https://primedatacenters.com/locations/dallas/

Capacity Basis · 8 MW is the operating DFW01-01 building design. A separate 12 MW building remains in construction, producing a 20 MW full campus envelope.

actual · Prime Dallas DFW01 Data Center Campus (project)

Claim 101134 · Review: Approved · Claim date: Not published

  1. Prime Data Centers Prime Dallas DFW01 profile

    Prime Data Centers · Document date: 2026-08-27 · Primary

    https://primedatacenters.com/locations/dallas/

Building Area · 213,000 square feet

actual · Prime Dallas DFW01 Data Center Campus (project)

Claim 101138 · Review: Approved · Claim date: Not published

  1. Snowhawk and Nuveen strategic investment in Prime

    Prime Data Centers · Document date: 2025-10-14 · Primary

    https://primedatacenters.com/news/snowhawk-and-nuveen-make-strategic-investment-in-prime-data-centers/

Counterparties and capital

Oncor · Utility Provider · CMP-1614

Prime Data Centers · Developer · CMP-0167

Equity Investment

Amount not disclosed · 2025-10-14

Platform-level funding context; no site-level amount is inferred.

Prime Data Centers (Borrower)

Financing record 200; claim-specific source links appear in the exhibit sources where published.

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.