Skip to content

Aligned Plano DFW01–DFW02 Data Center Campus

Plano, Texas, United StatesPartially operational
Evidence
Planned critical IT
46 MW
Updated
Oct 28, 2026
Utility
Oncor

Aligned Plano DFW01–DFW02 Data Center Campus, also known as Aligned Plano Campus, is a data center project in Plano, TX, US associated with Aligned Data Centers. 19-acre campus; 375,000 square feet; DFW01 at 10 MW and DFW02 at 36 MW; 46 MW total power. Tier III-designed Plano campus with high-density rack support and diverse fiber access.

Capacity

Reported capacity

Design

46 MW

Source

Reported capacity

Planned / design or future potential

46 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

46 MW is the operator-published facility or campus design boundary.

Participants

Aligned Data Centers

Developer

Sources by role
Developer (1)
Other participants (1)
Oncor

Utility provider

Sources by role
Utility provider (1)

Site & development

Location context

Actual

Aligned Plano Campus | Plano | TX | US

Source

Location context

Actual

Aligned Plano Campus | Plano | TX | US

Source

Location context

Actual

Plano, TX, US

Source

Development detail

Actual

19-Acre campus; 375,000 square feet; DFW01 at 10 MW and DFW02 at 36 MW; 46 MW total power.

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

Aligned Data Centers publishes 46 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

46 MW facility or campus design capacity.

Source

Project identity

Actual

Aligned Plano Campus

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

46 MW facility or campus design capacity.

Source

Infrastructure & permits

Technical details (3)
Electric grid

Energized

Tier III-designed Plano campus with high-density rack support and diverse fiber access.

Cooling system

Operational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Electric grid

Energized

46 MW IT design

DFW01 and DFW02 designs total 46 MW on a single campus.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
CoreWeave Plano AI Data Center

Operating · Plano, Texas, United States

Same locality: Plano

Compare in a collection
DataBank DFW3 Plano Data Center

Operating · Plano, Texas, United States

Same locality: Plano

Compare in a collection
Skybox Atlantic Station Data Center Campus

Preconstruction · Plano, Texas, United States

Same locality: Plano

Compare in a collection
STACK DFW01 Plano Data Center Campus

Partially operational · Plano, Texas, United States

Same locality: Plano