Aligned Plano DFW01–DFW02 Data Center Campus

Plano, Texas, United StatesPartially operational
Capacity
46 MW
Planned / design
Lead participant
Aligned Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Aligned Plano DFW01–DFW02 Data Center Campus

Aligned Plano DFW01–DFW02 Data Center Campus, also known as Aligned Plano Campus, is a data center project in Plano, TX, US associated with Aligned Data Centers. 19-acre campus; 375,000 square feet; DFW01 at 10 MW and DFW02 at 36 MW; 46 MW total power. Tier III-designed Plano campus with high-density rack support and diverse fiber access.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load46 MWDesign · Aligned Plano DFW01–DFW02 Data Center Campus
Design46 MWDesign · Aligned Plano DFW01–DFW02 Data Center Campus

Development

1 phases · 2 milestones
Operating facility and documented expansionPartially Operational

46 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

May 20, 2024
Current source record reviewed for Aligned Plano Campus
Completed
Aug 30, 2026
Operating boundary reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

Tier III-designed Plano campus with high-density rack support and diverse fiber access.

Cooling SystemOperational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Electric GridEnergized

46 MW IT design

DFW01 and DFW02 designs total 46 MW on a single campus.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 2Cooling & water: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
Aligned Plano Campus | Plano | TX | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
46 MW
Design
Capacity Basis
Aligned Data Centers publishes 46 MW of critical IT capacity for this record boundary.
Actual
Location Context
Aligned Plano Campus | Plano | TX | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
46 MW
Design
Capacity Basis
46 MW facility or campus design capacity.
Actual
Project Identity
Aligned Plano Campus
Actual
Location Context
Plano, TX, US
Actual
Lifecycle Status
Partially operational
Actual
Development Detail
19-Acre campus; 375,000 square feet; DFW01 at 10 MW and DFW02 at 36 MW; 46 MW total power.
Actual
Capacity Basis
46 MW facility or campus design capacity.