Crow Holdings–CleanArc Stemmons Data Center Campus

Dallas, Texas, United StatesPreconstruction
Evidence
Planned / design
245 MW
Updated
Oct 28, 2026

Crow Holdings and CleanArc are developing a 40-acre data center campus in Dallas’s Stemmons Corridor. The full campus is planned for up to 245 MW, with an initial 70 MW building targeted for late 2027. Crow Holdings, CleanArc Data Centers is associated with the development in Dallas, Dallas County, TX, US. The disclosed development scope includes 245 MW planned campus; initial 70 MW building; approximately 40 acres. Power and physical infrastructure include dedicated on-site substation planned near major Dallas interconnection hubs. Crow Holdings states the campus is planned for up to 245 MW.

Capacity

Reported capacity

Planned / design or future potential

245 MW

Source

Reported capacity

Planned / design or future potential

245 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development programAnnounced or preconstruction

Project-wide phase for Crow Holdings–CleanArc Stemmons Data Center Campus; capacity class is design.

Milestones (2)
Crow Holdings Central Dallas Campus development disclosed

Jan 20, 2026 · Recorded actual event

Completed · Announced

Source not linked
Design and procurement underway; first building targeted for late 2027

Date not disclosed · Forecast / planned record

Forecast · Forecast completion

Source not linked

Participants

Site & development

Location context

Actual

Stemmons Corridor campus | Dallas | Texas

Source

Location context

Actual

Stemmons Corridor campus | Dallas | Texas

Source

Development scale

Actual

245 MW planned campus

Source

Development milestone

Actual

Initial 70 MW building

Source

Site configuration

Actual

Stemmons Corridor campus | Dallas | Texas

Source

Technical specifications

Power arrangement

Actual

Approximately 40 acres.

Source

Additional project facts

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

Crow Holdings states the campus is planned for up to 245 MW.

Source

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

Crow Holdings states the campus is planned for up to 245 MW.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

245 MW

Crow Holdings states the campus is planned for up to 245 MW.

Site facility

Planned or represented

Dedicated on-site substation planned near major Dallas interconnection hubs.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (3)
GridFree AI South Dallas One

Proposed · Dallas, Texas, United States

Same locality: Dallas

Compare in a collection
Prime Dallas DFW01 Data Center Campus

Partially operational · Dallas, Texas, United States

Same locality: Dallas

Compare in a collection
Crow Holdings–CleanArc Central Dallas Campus

Preconstruction · Stemmons Corridor, central Dallas, Texas, United States

Shared participant: CleanArc Data Centers · Shared participant: Crow Holdings · Same market: Texas, United States

Compare in a collection