Data center siteSite record

Crow Holdings–CleanArc Stemmons Data Center Campus

Dallas, Texas, United StatesPreconstruction
Capacity
245 MW
Planned / design
Lead participant
CleanArc Data Centers
Developer
Last updated
Aug 27, 2026
Most recent public record update

About Crow Holdings–CleanArc Stemmons Data Center Campus

Crow Holdings and CleanArc are developing a 40-acre data center campus in Dallas’s Stemmons Corridor. The full campus is planned for up to 245 MW, with an initial 70 MW building targeted for late 2027. Crow Holdings, CleanArc Data Centers is associated with the development in Dallas, Dallas County, TX, US. The disclosed development scope includes 245 MW planned campus; initial 70 MW building; approximately 40 acres. Power and physical infrastructure include dedicated on-site substation planned near major Dallas interconnection hubs. Crow Holdings states the campus is planned for up to 245 MW.

Projects sharing a market, utility, or organization.

3 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Design245 MWDesign · Crow Holdings–CleanArc Stemmons Data Center Campus
Design245 MWDesign · Crow Holdings–CleanArc Stemmons Data Center Campus

Development

1 phases · 2 milestones
Development programAnnounced Or Preconstruction

Project-wide phase for Crow Holdings–CleanArc Stemmons Data Center Campus; capacity class is design.

Jan 20, 2026
Crow Holdings Central Dallas Campus development disclosed
Completed
Design and procurement underway; first building targeted for late 2027
Forecast

Infrastructure

Electric GridPlanned Or Represented

245 MW

Crow Holdings states the campus is planned for up to 245 MW.

Site FacilityPlanned Or Represented

Dedicated on-site substation planned near major Dallas interconnection hubs.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
Stemmons Corridor campus | Dallas | Texas
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
245 MW
Design
Capacity Basis
Crow Holdings states the campus is planned for up to 245 MW.
Actual
Location Context
Stemmons Corridor campus | Dallas | Texas
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
245 MW
Design
Capacity Basis
Crow Holdings states the campus is planned for up to 245 MW.
Actual
Development Scale
245 MW planned campus
Actual
Development Milestone
Initial 70 MW building
Actual
Power Arrangement
Approximately 40 acres.
Actual
Site Configuration
Stemmons Corridor campus | Dallas | Texas
Actual