Crusoe Port of Victoria Campus

Victoria, Texas, United StatesProposed
Evidence
Headline capacity
Not established in published records
Updated
Oct 28, 2026

Blue Energy announced on September 16, 2026 that it had submitted the first part of its NRC construction-permit application for the Port of Victoria gas-to-nuclear power project the previous day. This is a power-project application, not permit approval or evidence that Crusoe’s data center capacity is operating. Crusoe Port of Victoria Campus is a proposed AI-infrastructure development in Victoria County, Texas. Public project records support a large industrial-site concept, but the tracked 1.5 GW figure is not sufficiently verified as operating, contracted or phase-specific IT capacity. Port land arrangements, customer commitment, generation and grid service, water, permits, financing and schedule require project-specific primary confirmation.

Capacity

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Port-site and utility verificationAnnounced or preconstruction

Crusoe Port of Victoria Campus is a proposed AI-infrastructure development in Victoria County, Texas. Public project records support a large industrial-site concept, but the tracked 1.5 GW figure is not sufficiently verified as operating, contracted or phase-specific IT capacity. The available public sources do not establish a single project-scoped capacity figure. Port land arrangements, customer commitment, generation and grid service, water, permits, financing and schedule require project-specific primary confirmation.

Participants

Crusoe

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Crusoe Port of Victoria Campus | Victoria | Texas | US

Source

Location context

Actual

Crusoe Port of Victoria Campus | Victoria | Texas | US

Source

Location context

Actual

Port of Victoria, Texas

Source

Additional project facts

Lifecycle status

Actual

Proposed

Source

Capacity basis

Actual

1,500 MW future full build site capacity; not measured operating IT load.

Source

Lifecycle status

Actual

Proposed

Source

Developer association

Actual

Crusoe

Source

Capacity status

Actual

1.5 GW remains unverified project specifically

Source

Infrastructure & permits

Technical details (2)
Site facility

Planned or represented

Industrial land and utility arrangements require board-record confirmation.

Electric grid

Unknown

1,500 MW

Secondary estimate; headline withheld.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (3)
Crusoe–Lancium Childress AI Data Center Campus

Preconstruction · Childress, Texas, United States

Shared participant: Crusoe · Same market: Texas, United States

Compare in a collection
Crusoe–Microsoft Abilene

Preconstruction · Abilene, Texas, United States

Shared participant: Crusoe · Same market: Texas, United States