Crusoe–Lancium Childress AI Data Center Campus
Preconstruction · Childress, Texas, United States
IREN is delivering four Horizon data centers at its Childress campus under a multi-year Microsoft agreement. Horizon 1–4 collectively provide 200 MW of contracted critical IT load within the broader 750 MW campus. IREN, Microsoft is associated with the development in Childress, Childress County, TX, US. The disclosed development scope includes 200 MW contracted critical IT across Horizon 1–4; 750 MW broader campus; phased deployment through 2026. Power and physical infrastructure include liquid-cooled GPU data centers within IREN’s Childress power campus. IREN states Horizon 1–4 will collectively provide 200 MW of critical IT load under the Microsoft agreement.
Projects sharing a market, utility, or organization.
Preconstruction · Childress, Texas, United States
Under construction · Sweetwater area, Texas, United States
Preconstruction · Sweetwater area, Texas, United States
Operating / Stabilized · San Antonio, Texas, United States
Project-wide phase for IREN Childress Horizon AI Data Center Campus; capacity class is contracted supply.
200 MW
IREN states Horizon 1–4 will collectively provide 200 MW of critical IT load under the Microsoft agreement.
Liquid-cooled GPU data centers within IREN’s Childress power campus.
No map point available
Published claims and their source links.