Skip to content
All records
Data center siteSite record

STACK Portland Hillsboro Data Center Campus

Hillsboro, Oregon, United StatesPartially operational
Capacity
200 MW
Planned / design
Lead participant
STACK Infrastructure
Developer
Last updated
Aug 27, 2026
Most recent public record update

About STACK Portland Hillsboro Data Center Campus

STACK expanded its flagship Hillsboro campus plan to 200 MW while retaining operating and in-development phases in the Portland market. STACK Infrastructure is publicly identified in the project record for Hillsboro, Washington County, OR, US. The disclosed development record includes 200 MW current and expansion capacity; approximately 50-acre expanded campus; adjacent to major utility and fiber infrastructure. Power and infrastructure include renewable-powered Hillsboro campus with substation proximity and transpacific fiber connectivity. STACK identifies 200 MW of current and expansion capacity at its flagship Portland campus.

Projects sharing a market, utility, or organization.

2 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Design200 MWDesign · STACK Portland Hillsboro Data Center Campus

Development

1 phases · 2 milestones
Operating and expansion programPartially Operational

Project-wide phase for STACK Portland Hillsboro Data Center Campus; capacity remains classified as design.

Jul 20, 2022
STACK Portland Campus project status and capacity disclosed
Completed
Operational campus with major expansion capacity
Forecast

Infrastructure

Electric GridPartially Operational

200 MW

STACK identifies 200 MW of current and expansion capacity at its flagship Portland campus.

Site FacilityPartially Operational

Renewable-powered Hillsboro campus with substation proximity and transpacific fiber connectivity.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

8 facts
Location Context
STACK campus | Hillsboro | Washington County | Oregon
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
200 MW
Design
Capacity Basis
STACK identifies 200 MW of current and expansion capacity at its flagship Portland campus.
Actual
Development Scale
200 MW current and expansion capacity
Actual
Development Milestone
Approximately 50-acre expanded campus
Actual
Power Arrangement
Adjacent to major utility and fiber infrastructure.
Actual
Boundary Context
STACK campus | Hillsboro | Washington County | Oregon
Actual