NTT Hillsboro Campus

Hillsboro, Oregon, United StatesPartially operational
Evidence
Planned critical IT
126 MW
Updated
Oct 29, 2026

NTT markets Hillsboro’s 47-acre campus with 126 MW of planned IT capacity across five centers and HI1 at 36 MW. Lewis describes 138 MW across three facilities—HI1 36 MW, HI2 66 MW and HI3 36 MW—with OEG corroborating HI2. These unreconciled operator/contractor scopes are not commissioned load. HI1 offers closed-loop cooling and Subsea Connect connectivity. County account R685967 lists HI LLC and 47.85 acres in different tax-year sections; linked R2214135 is machinery/equipment, not a second land parcel. The campus is partly operational; full-campus commissioning remains unverified.

Capacity

Target IT capacity MW

Planned / design or future potential

126 MW

Source

Hi1 design critical IT capacity MW

Design

36 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

HI1Operational

1 building

Currently marketed initial facility; 36 MW specification, not occupied load. Evidence: SRC-N220-NTT-HILLSBORO-S1

Remaining campus buildingsPlanned

4 buildings

Five-centre 126 MW campus plan; full operation unverified. Evidence: SRC-N220-NTT-HILLSBORO-S2

Milestones (1)
Opening reported within 2020–2021 interval, not exact January 1: Operator reports Hillsboro campus opened during 2020/21.

2020 · Recorded actual event

Completed · Announced

Sources (1)

Participants

NTT DATA

Developer · Operator

Sources by role
Developer / Operator (1)
Developer / Operator (1)

Capital & incentives

Capital claims

Reviewed h sale context

Reported rounded

The sales history for Washington County account R685967 records a 6 September 2019 sale from SunPower Manufacturing Oregon LLC to NTT Global Data Centers HI LLC for $63.5 million, with instrument number 2019060389. This is assessor reported property sale history, not campus construction cost or a financing facility; the deed and complete title chain were not inspected.

Source

Site & development

Site location

Reported rounded

HI1 anchor: 4050 NE Evergreen Road, Hillsboro 97124; operator describes a 47-acre campus.

Source

Additional project facts

Reviewed h assessor context

Reported rounded

Washington County account R685967, captured on 31 October 2026, lists NTT Global Data Centers HI LLC in its 2027 owner section. It links 4050 NE Evergreen Road and 4510 NE Dawson Creek Drive, map 1N2280002900. Its legal description and 2026 land segments state 47.85 acres. This is tax account evidence, not inspected title or proof all planned buildings share a parcel. The county links it to R2214135, classified Industrial M&E with legal description associated machinery/equipment, using the same map number and HI LLC owner name. That associated account is not evidence of a second land parcel.

Source

Reviewed h exemptions context

Reported rounded

Washington County account R685967 lists an enterprise zone construction in progress exemption entry expiring in 2027 and enterprise zone exemption entries with expiration years from 2027 through 2031. These are account level entries, not a single campus wide term, cash award or established amount of tax savings.

Source

Reviewed h capacity scopes context

Reported rounded

Lewis describes a 138 MW delivery scope across three facilities: HI1 36 MW, HI2 66 MW and HI3 36 MW. OEG corroborates HI2's 66 MW and names Lewis as general contractor. These are contractor attributed scopes, not verified commissioned load or a reconciled replacement for the existing operator attributed campus headline and building count. The scope conflict remains unresolved; no plan revision chronology is established.

Source

Infrastructure & permits

Technical details (3)
Utility service

Reported context

HI1 N+1 distributed redundancy per vault; renewable energy options, not proof of 100% renewable consumption.

Cooling system

Reported context

HI1 fan-coil walls, hot-aisle containment and dedicated closed-loop chiller plant.

Fiber

Reported context

HI1 three diverse entries, two meet-me rooms and Subsea Connect toward Asia-Pacific.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
Aligned Hillsboro Campus

Under construction · Hillsboro, Oregon, United States

Same locality: Hillsboro

Compare in a collection
QTS HIL1 Hillsboro 1 Data Center

Partially operational · Hillsboro, Oregon, United States

Same locality: Hillsboro

Compare in a collection
QTS HIL2 Hillsboro Data Center Campus

Partially operational · Hillsboro, Oregon, United States

Same locality: Hillsboro

Compare in a collection
STACK Portland Hillsboro Data Center Campus

Partially operational · Hillsboro, Oregon, United States

Same locality: Hillsboro

Compare in a collection