Aligned Hillsboro Campus
- Planned critical IT
- 108 MW
- Updated
- Oct 31, 2026
Aligned Hillsboro Campus. NE 30th Avenue / NE Evergreen Road; 27.02-acre plan. City DR-021-23 lists tax lots 1N220D000300/400 and 1N2210001801/1802/1804. 108 MW planned critical capacity: 72 MW first building plus 36 MW second. Separate 120 MW utility capacity. Operating load unknown. PDX-01 has progressed beyond preconstruction. Largo Concrete reports completion of its structural-concrete scope in January 2025, and Aligned subsequently reported preparation for utility delivery and commissioning. Aligned also reports deployment of a battery-storage system with PGE and Calibrant Energy. These sources do not establish commissioned IT capacity or full-building operational status. Brochure identifies 34.5 kV feeds from Evergreen substation. Voltage is separate from 120 MW utility availability. Delta3 air cooling with closed-loop chilled water; current page describes liquid-cooling provision and N+1 redundancy. Multiple nearby carriers; no specific signed fiber supplier verified. Enterprise Zone incentives are described as available; campus award or debt transaction not established. Exact current operating load and unverified legal or financial details remain unknown.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
1 building
72 MW planned critical capacity for the first building. Largo reports completion of its structural-concrete scope in January 2025; Aligned subsequently reported preparations for utility delivery and commissioning. These milestones do not establish commissioned IT capacity or full-building operational status.
1 building
36 MW critical capacity within 108 MW total. Evidence: SRC-N220-ALIGNED-HILLSBORO-S2
Milestones (2)
Jan 10, 2023 · Recorded actual event
Completed · Announced
Sources (1)
Aug 7, 2023 · Recorded actual event
Completed · Announced
Sources (1)
- Development Review status — September 20, 2023 · Sep 20, 2023 · Primary
Participants
Site & development
Site location
Reported roundedNE 30th Avenue / NE Evergreen Road; 27.02-acre plan. City DR-021-23 lists tax lots 1N220D000300/400 and 1N2210001801/1802/1804.
SourceConstruction stage context
ActualPDX-01 has progressed beyond preconstruction. Largo Concrete reports completion of its structural concrete scope in January 2025, and Aligned subsequently reported preparation for utility delivery and commissioning. Aligned also reports deployment of a battery storage system with PGE and Calibrant Energy. These sources do not establish commissioned IT capacity or full building operational status.
SourceInfrastructure & permits
Technical details (4)
Reported context
Brochure identifies 34.5 kV feeds from Evergreen substation. Voltage is separate from 120 MW utility availability.
Reported context
Delta3 air cooling with closed-loop chilled water; current page describes liquid-cooling provision and N+1 redundancy.
Reported context
Multiple nearby carriers; no specific signed fiber supplier verified.
Planned or represented
120 MW
Operator-reported utility capacity, not campus IT or verified energized load.
Project map
Other · Documented
Aligned Hillsboro Campus
Sources (1)
- Development Review status — September 20, 2023 · Sep 20, 2023 · Primary
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (4)
Partially operational · Hillsboro, Oregon, United States
Same locality: Hillsboro
Compare in a collectionPartially operational · Hillsboro, Oregon, United States
Same locality: Hillsboro
Compare in a collectionPartially operational · Hillsboro, Oregon, United States
Same locality: Hillsboro
Compare in a collectionPartially operational · Hillsboro, Oregon, United States
Same locality: Hillsboro
Compare in a collection