STACK MIL05 is a two-building, 60 MW future campus at Vignate east of Milan. The Italian environment ministry completed procedure 13497 and issued positive decree DM_2026-0000411 with prescriptions on 30 June 2026. The approval advances the regulatory record but does not prove construction start, energization or operating IT. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.
Projects sharing a market, utility, or organization.
Partially operational · Milan, Lombardy, Italy
Partially operational · Milan, Lombardy, Italy
Partially operational · Milan, Lombardy, Italy
Preconstruction · Milan, Lombardy, Italy
STACK MIL05 is a two-building, 60 MW future campus at Vignate east of Milan. The Italian environment ministry completed procedure 13497 and issued positive decree DM_2026-0000411 with prescriptions on 30 June 2026. The approval advances the regulatory record but does not prove construction start, energization or operating IT. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.
60 MW
60 MW is the published future facility or full-build design boundary; it is not operating IT load.
Two-building campus with a 48 MW primary building and a 12 MW secondary building.
Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.