Data center siteSite record

STACK MIL06 East Milan Data Center Campus

Milan, Lombardy, ItalyPartially operational
Capacity
40 MW
Planned critical IT
Lead participant
STACK Infrastructure
Developer
Last updated
Aug 29, 2026
Most recent public record update

About STACK MIL06 East Milan Data Center Campus

STACK MIL06 East Milan Data Center Campus, also known as STACK MIL06, is a data center project in Milan, Lombardy, IT developed and operated by STACK Infrastructure. 16-acre east Milan campus planned for two buildings and 40 MW of critical capacity. Scalable campus power, cooling and connectivity in the Milan data center market. 40 MW is the two-building campus design boundary. Independent market evidence records STACK capacity at Siziano as built/under construction, but live tenant utilization is not public.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load40 MWDesign · STACK MIL06 East Milan Data Center Campus
Design40 MWDesign · STACK MIL06 East Milan Data Center Campus

Development

1 phases · 1 milestones
Operating facility and documented expansionPartially Operational

40 MW is the two-building campus design boundary. Independent market evidence records STACK capacity at Siziano as built/under construction, but live tenant utilization is not public.

Aug 28, 2026
Current source record reviewed for STACK MIL06
Completed

Infrastructure

Electric GridEnergized

Scalable campus power, cooling and connectivity in the Milan data center market.

FiberEnergized

STACK markets diverse fiber and carrier-neutral deployment options; installed and contracted capacity remain distinct.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

10 facts
Location Context
STACK MIL06 | Milan | Lombardy | IT
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
40 MW
Design
Capacity Basis
STACK Infrastructure publishes 40 MW of critical IT capacity for this record boundary.
Actual
Location Context
STACK MIL06 | Milan | Lombardy | IT
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
40 MW
Design
Capacity Basis
40 MW is the two building campus design boundary. Independent market evidence records STACK capacity at Siziano as built/under construction, but live tenant utilization is not public.
Actual
Site Area
16 acres
Actual
Building Count
2
Design