Skip to content
All records
Data center siteSite record

STACK MIL03 Milan Data Center Campus

Milan, Lombardy, ItalyPartially operational
Capacity
5 MW
Planned critical IT
Lead participant
STACK Infrastructure
Developer
Last updated
Aug 28, 2026
Most recent public record update

About STACK MIL03 Milan Data Center Campus

STACK MIL03 Milan Data Center Campus, also known as STACK MIL03, is a data center project in Milan, Lombardy, IT. 2.7-acre, single-building Milan campus with 5 MW of critical capacity. Renewable-power facility positioned above the 500-year flood plain with dedicated connectivity infrastructure. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load5 MWDesign · STACK MIL03 Milan Data Center Campus
Design5 MWDesign · STACK MIL03 Milan Data Center Campus

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

STACK MIL03 Milan Data Center Campus, also known as STACK MIL03, is a data center project in Milan, Lombardy, IT. 2.7-acre, single-building Milan campus with 5 MW of critical capacity. Renewable-power facility positioned above the 500-year flood plain with dedicated connectivity infrastructure. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Aug 29, 2026
Project-specific evidence refreshed and reconciled
Completed

Infrastructure

Electric GridOperational

5 MW

5 MW is the operator-published facility design or maximum power boundary; it is not measured tenant utilization.

FiberOperational

Renewable-power facility positioned above the 500-year flood plain with dedicated connectivity infrastructure.

Cooling SystemOperational

Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

15 facts
Location Context
STACK MIL03 | Milan | Lombardy | IT
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
5 MW
Design
Capacity Basis
STACK Infrastructure publishes 5 MW of critical IT capacity for this record boundary.
Actual
Location Context
STACK MIL03 | Milan | Lombardy | IT
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
5 MW
Design
Capacity Basis
5 MW is the operator published facility design or maximum power boundary; it is not measured tenant utilization.
Actual
Operator Or Developer
STACK Infrastructure
Actual
Project Location
Milan, Lombardy, IT
Actual
Current Lifecycle
Operating or in phased operation
Actual
Capacity Classification
Design
Actual
Capacity Basis
5 MW is the operator published facility design or maximum power boundary; it is not measured tenant utilization.
Actual
Customer Utilization
Not publicly disclosed
Actual
Source Refresh Date
2026-08-29
Actual