CyrusOne NVA1–NVA3 Sterling Data Center Campus
Partially operational · Sterling, Virginia, United States
CyrusOne NVA8 Sterling Data Center, also known as CyrusOne NVA8, is a partially operational data center campus in Sterling, VA, US associated with CyrusOne. 154,230 square feet; 24 MW critical IT capacity; ultra-low-PUE design. Standalone Sterling facility near the broader CyrusOne campus with water-free cooling and dense fiber connectivity.
Projects sharing a market, utility, or organization.
Partially operational · Sterling, Virginia, United States
Partially operational · Sterling, Virginia, United States
Partially operational · Sterling, Virginia, United States
Partially operational · Sterling, Virginia, United States
24 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.
24 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.
Zero-water cooling, a 10,000-ton air-cooled chiller plant, robust fiber connectivity and multilayer security.
CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.
Standalone Sterling facility near the broader CyrusOne campus with water-free cooling and dense fiber connectivity.
Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.
No map point available
Published claims and their source links.