Data center siteSite record

CyrusOne NVA8 Sterling Data Center

Sterling, Virginia, United StatesPartially operational
Capacity
24 MW
Planned / design
Lead participant
CyrusOne
Developer
Last updated
Aug 30, 2026
Most recent public record update

About CyrusOne NVA8 Sterling Data Center

CyrusOne NVA8 Sterling Data Center, also known as CyrusOne NVA8, is a partially operational data center campus in Sterling, VA, US associated with CyrusOne. 154,230 square feet; 24 MW critical IT capacity; ultra-low-PUE design. Standalone Sterling facility near the broader CyrusOne campus with water-free cooling and dense fiber connectivity.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load24 MWDesign · CyrusOne NVA8 Sterling Data Center
Design24 MWDesign · CyrusOne NVA8 Sterling Data Center
Design24 MWDesign · CyrusOne NVA8 Sterling Data Center
Design24 MWDesign · CyrusOne NVA8 Sterling Data Center

Development

2 phases · 3 milestones
Operating facility and documented expansionOperational

24 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Operating facility and documented expansionPartially Operational

24 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Primary project source reviewed for CyrusOne NVA8
Completed
Aug 28, 2026
Current source record reviewed for CyrusOne NVA8
Completed
Aug 30, 2026
Design capacity reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

Zero-water cooling, a 10,000-ton air-cooled chiller plant, robust fiber connectivity and multilayer security.

Cooling SystemOperational

CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.

Electric GridEnergized

Standalone Sterling facility near the broader CyrusOne campus with water-free cooling and dense fiber connectivity.

Cooling SystemOperational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 2Cooling & water: 2

Facts & sources

Published claims and their source links.

22 facts
Location Context
CyrusOne NVA8 | Sterling | VA | US
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
24 MW
Design
Capacity Basis
CyrusOne publishes 24 MW of critical IT capacity for this record boundary.
Actual
Location Context
CyrusOne NVA8 | Sterling | VA | US
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
24 MW
Design
Capacity Basis
24 MW facility or campus design capacity.
Actual
Project Boundary
CyrusOne NVA8
Actual
Location Context
Sterling, VA, US
Actual
Lifecycle Status
Operating
Actual
Capacity Basis
24 MW facility or campus design capacity.
Actual
Location Context
CyrusOne NVA8 | Sterling | VA | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
24 MW
Design
Capacity Basis
24 MW facility or campus IT design capacity.
Actual
Reported Capacity
24 MW
Design
Project Identity
CyrusOne NVA8
Actual
Location Context
Sterling, VA, US
Actual
Lifecycle Status
Partially operational
Actual
Development Detail
154,230 Square feet; 24 MW critical IT capacity; ultra low-PUE design.
Actual
Capacity Basis
24 MW facility or campus IT design capacity.
Actual