CyrusOne NVA4 Sterling Data Center

Sterling, Virginia, United StatesPartially operational
Capacity
11 MW
Planned / design
Lead participant
CyrusOne
Developer
Last updated
Aug 30, 2026
Most recent public record update

About CyrusOne NVA4 Sterling Data Center

CyrusOne NVA4 Sterling Data Center, also known as CyrusOne NVA4, is a partially operational data center campus in Sterling, VA, US associated with CyrusOne. 128,715 square feet; 11 MW total IT capacity; 12.6 MW power capacity. Sterling facility with high-availability metro and long-haul connectivity plus water-free cooling.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load11 MWDesign · CyrusOne NVA4 Sterling Data Center
Design11 MWDesign · CyrusOne NVA4 Sterling Data Center
Design11 MWDesign · CyrusOne NVA4 Sterling Data Center
Design11 MWDesign · CyrusOne NVA4 Sterling Data Center

Development

2 phases · 3 milestones
Operating facility and documented expansionOperational

11 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Operating facility and documented expansionPartially Operational

11 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Primary project source reviewed for CyrusOne NVA4
Completed
Aug 28, 2026
Current source record reviewed for CyrusOne NVA4
Completed
Aug 30, 2026
Design capacity reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

High-availability metro and long-haul connectivity, water-free cooling, efficient chillers and multilayer access controls.

Cooling SystemOperational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Electric GridEnergized

Sterling facility with high-availability metro and long-haul connectivity plus water-free cooling.

Cooling SystemOperational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 2Cooling & water: 2

Facts & sources

Published claims and their source links.

23 facts
Location Context
CyrusOne NVA4 | Sterling | VA | US
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
11 MW
Design
Capacity Basis
CyrusOne publishes 11 MW of critical IT capacity for this record boundary.
Actual
Location Context
CyrusOne NVA4 | Sterling | VA | US
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
11 MW
Design
Capacity Basis
11 MW facility or campus design capacity.
Actual
Project Boundary
CyrusOne NVA4
Actual
Location Context
Sterling, VA, US
Actual
Lifecycle Status
Operating
Actual
Development Detail
Northern Virginia facility; 128,715 square feet; 11 MW total IT capacity.
Actual
Capacity Basis
11 MW facility or campus design capacity.
Actual
Location Context
CyrusOne NVA4 | Sterling | VA | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
11 MW
Design
Capacity Basis
11 MW facility or campus IT design capacity.
Actual
Reported Capacity
11 MW
Design
Project Identity
CyrusOne NVA4
Actual
Location Context
Sterling, VA, US
Actual
Lifecycle Status
Partially operational
Actual
Development Detail
128,715 Square feet; 11 MW total IT capacity; 12.6 MW power capacity.
Actual
Capacity Basis
11 MW facility or campus IT design capacity.
Actual