CyrusOne NVA1–NVA3 Sterling Data Center Campus
Partially operational · Sterling, Virginia, United States
CyrusOne NVA4 Sterling Data Center, also known as CyrusOne NVA4, is a partially operational data center campus in Sterling, VA, US associated with CyrusOne. 128,715 square feet; 11 MW total IT capacity; 12.6 MW power capacity. Sterling facility with high-availability metro and long-haul connectivity plus water-free cooling.
Projects sharing a market, utility, or organization.
Partially operational · Sterling, Virginia, United States
Partially operational · Sterling, Virginia, United States
Partially operational · Sterling, Virginia, United States
Partially operational · Sterling, Virginia, United States
11 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.
11 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.
High-availability metro and long-haul connectivity, water-free cooling, efficient chillers and multilayer access controls.
Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.
Sterling facility with high-availability metro and long-haul connectivity plus water-free cooling.
Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.