Skip to content

CyrusOne NVA1–NVA3 Sterling Data Center Campus

Sterling, Virginia, United StatesPartially operational
Evidence
Planned critical IT
44 MW
Updated
Oct 28, 2026

CyrusOne NVA1–NVA3 Sterling Data Center Campus, also known as CyrusOne NVA1–NVA3, is a partially operational data center campus in Sterling, VA, US associated with CyrusOne. 14-acre site; 420,000 square feet; 44 MW total IT capacity. Enterprise-class Northern Virginia campus with direct internet-exchange access and water-free cooling.

Capacity

Reported capacity

Design

44 MW

Source

Reported capacity

Planned / design or future potential

44 MW

Source

Reported capacity

Planned / design or future potential

44 MW

Source

Reported capacity

Planned / design or future potential

44 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

44 MW is the operator-published facility or campus design boundary.

Operating facility and documented expansionPartially operational

44 MW is the operator-published facility or campus IT design boundary.

Participants

CyrusOne

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

CyrusOne NVA1–NVA3 | Sterling | VA | US

Source

Location context

Actual

CyrusOne NVA1–NVA3 | Sterling | VA | US

Source

Location context

Actual

Sterling, VA, US

Source

Location context

Actual

CyrusOne NVA1–NVA3 | Sterling | VA | US

Source

Location context

Actual

Sterling, VA, US

Source

Development detail

Actual

14-Acre site; 420,000 square feet; 44 MW total IT capacity.

Source

Additional project facts

Lifecycle status

Actual

Operational

Source

Capacity basis

Actual

CyrusOne publishes 44 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

44 MW facility or campus design capacity.

Source

Project boundary

Actual

CyrusOne NVA1–NVA3

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

44 MW facility or campus design capacity.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

44 MW facility or campus IT design capacity.

Source

Project identity

Actual

CyrusOne NVA1–NVA3

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

44 MW facility or campus IT design capacity.

Source

Infrastructure & permits

Technical details (4)
Electric grid

Energized

Direct access to a major internet exchange, zero-water cooling, efficient chillers and up to seven physical-security layers.

Cooling system

Operational

CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.

Electric grid

Energized

Enterprise-class Northern Virginia campus with direct internet-exchange access and water-free cooling.

Cooling system

Operational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
CyrusOne NVA4 Sterling Data Center

Partially operational · Sterling, Virginia, United States

Same locality: Sterling · Shared participant: CyrusOne

Compare in a collection
CyrusOne NVA5–NVA7 Sterling Data Center Campus

Partially operational · Sterling, Virginia, United States

Same locality: Sterling · Shared participant: CyrusOne

Compare in a collection
CyrusOne NVA8 Sterling Data Center

Partially operational · Sterling, Virginia, United States

Same locality: Sterling · Shared participant: CyrusOne

Compare in a collection
CyrusOne NVA9 Sterling Data Center

Partially operational · Sterling, Virginia, United States

Same locality: Sterling · Shared participant: CyrusOne

Compare in a collection