CyrusOne NVA4 Sterling Data Center
Partially operational · Sterling, Virginia, United States
CyrusOne NVA1–NVA3 Sterling Data Center Campus, also known as CyrusOne NVA1–NVA3, is a partially operational data center campus in Sterling, VA, US associated with CyrusOne. 14-acre site; 420,000 square feet; 44 MW total IT capacity. Enterprise-class Northern Virginia campus with direct internet-exchange access and water-free cooling.
Projects sharing a market, utility, or organization.
Partially operational · Sterling, Virginia, United States
Partially operational · Sterling, Virginia, United States
Partially operational · Sterling, Virginia, United States
Partially operational · Sterling, Virginia, United States
44 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.
44 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.
Direct access to a major internet exchange, zero-water cooling, efficient chillers and up to seven physical-security layers.
CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.
Enterprise-class Northern Virginia campus with direct internet-exchange access and water-free cooling.
Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.
No map point available
Published claims and their source links.