Skip to content
All records
Data center siteSite record

CyrusOne NVA1–NVA3 Sterling Data Center Campus

Sterling, Virginia, United StatesPartially operational
Capacity
44 MW
Planned / design
Lead participant
CyrusOne
Developer
Last updated
Aug 30, 2026
Most recent public record update

About CyrusOne NVA1–NVA3 Sterling Data Center Campus

CyrusOne NVA1–NVA3 Sterling Data Center Campus, also known as CyrusOne NVA1–NVA3, is a partially operational data center campus in Sterling, VA, US associated with CyrusOne. 14-acre site; 420,000 square feet; 44 MW total IT capacity. Enterprise-class Northern Virginia campus with direct internet-exchange access and water-free cooling.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load44 MWDesign · CyrusOne NVA1–NVA3 Sterling Data Center Campus
Design44 MWDesign · CyrusOne NVA1–NVA3 Sterling Data Center Campus
Design44 MWDesign · CyrusOne NVA1–NVA3 Sterling Data Center Campus
Design44 MWDesign · CyrusOne NVA1–NVA3 Sterling Data Center Campus

Development

2 phases · 3 milestones
Operating facility and documented expansionOperational

44 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Operating facility and documented expansionPartially Operational

44 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Primary project source reviewed for CyrusOne NVA1–NVA3
Completed
Aug 28, 2026
Current source record reviewed for CyrusOne NVA1–NVA3
Completed
Aug 30, 2026
Design capacity reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

Direct access to a major internet exchange, zero-water cooling, efficient chillers and up to seven physical-security layers.

Cooling SystemOperational

CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.

Electric GridEnergized

Enterprise-class Northern Virginia campus with direct internet-exchange access and water-free cooling.

Cooling SystemOperational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 2Cooling & water: 2

Facts & sources

Published claims and their source links.

22 facts
Location Context
CyrusOne NVA1–NVA3 | Sterling | VA | US
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
44 MW
Design
Capacity Basis
CyrusOne publishes 44 MW of critical IT capacity for this record boundary.
Actual
Location Context
CyrusOne NVA1–NVA3 | Sterling | VA | US
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
44 MW
Design
Capacity Basis
44 MW facility or campus design capacity.
Actual
Project Boundary
CyrusOne NVA1–NVA3
Actual
Location Context
Sterling, VA, US
Actual
Lifecycle Status
Operating
Actual
Capacity Basis
44 MW facility or campus design capacity.
Actual
Location Context
CyrusOne NVA1–NVA3 | Sterling | VA | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
44 MW
Design
Capacity Basis
44 MW facility or campus IT design capacity.
Actual
Reported Capacity
44 MW
Design
Project Identity
CyrusOne NVA1–NVA3
Actual
Location Context
Sterling, VA, US
Actual
Lifecycle Status
Partially operational
Actual
Development Detail
14-Acre site; 420,000 square feet; 44 MW total IT capacity.
Actual
Capacity Basis
44 MW facility or campus IT design capacity.
Actual