Skip to content

CyrusOne NVA5–NVA7 Sterling Data Center Campus

Sterling, Virginia, United StatesPartially operational
Evidence
Planned critical IT
116 MW
Updated
Oct 28, 2026

CyrusOne NVA5–NVA7 Sterling Data Center Campus, also known as CyrusOne NVA5–NVA7, is a partially operational data center campus in Sterling, VA, US associated with CyrusOne. More than 1.17 million square feet; 116 MW total IT capacity across the campus. Two large multi-story buildings with direct internet-exchange access, closed-loop cooling and multilayer security.

Capacity

Reported capacity

Design

116 MW

Source

Reported capacity

Planned / design or future potential

116 MW

Source

Reported capacity

Planned / design or future potential

116 MW

Source

Reported capacity

Planned / design or future potential

116 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

116 MW is the operator-published facility or campus design boundary.

Operating facility and documented expansionPartially operational

116 MW is the operator-published facility or campus IT design boundary.

Participants

CyrusOne

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

CyrusOne NVA5–NVA7 | Sterling | VA | US

Source

Location context

Actual

CyrusOne NVA5–NVA7 | Sterling | VA | US

Source

Technical area

Actual

1,177,019 square feet

Source

Physical buildings

Actual

2 buildings

Source

Location context

Actual

CyrusOne NVA5–NVA7 | Sterling | VA | US

Source

Location context

Actual

Sterling, VA, US

Source

Development detail

Actual

More than 1.17 million square feet; 116 MW total IT capacity across the campus.

Source

Additional project facts

Lifecycle status

Actual

Operational

Source

Capacity basis

Actual

CyrusOne publishes 116 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

116 MW facility or campus design capacity.

Source

Record facilities

Actual

3 facilities

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

116 MW facility or campus IT design capacity.

Source

Project identity

Actual

CyrusOne NVA5–NVA7

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

116 MW facility or campus IT design capacity.

Source

Infrastructure & permits

Technical details (4)
Electric grid

Energized

Direct access to major interconnection ecosystems, closed-loop cooling, efficient chillers and extensive onsite security.

Cooling system

Operational

CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.

Electric grid

Energized

Two large multi-story buildings with direct internet-exchange access, closed-loop cooling and multilayer security.

Cooling system

Operational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
CyrusOne NVA1–NVA3 Sterling Data Center Campus

Partially operational · Sterling, Virginia, United States

Same locality: Sterling · Shared participant: CyrusOne

Compare in a collection
CyrusOne NVA4 Sterling Data Center

Partially operational · Sterling, Virginia, United States

Same locality: Sterling · Shared participant: CyrusOne

Compare in a collection
CyrusOne NVA8 Sterling Data Center

Partially operational · Sterling, Virginia, United States

Same locality: Sterling · Shared participant: CyrusOne

Compare in a collection
CyrusOne NVA9 Sterling Data Center

Partially operational · Sterling, Virginia, United States

Same locality: Sterling · Shared participant: CyrusOne

Compare in a collection