CyrusOne NVA1–NVA3 Sterling Data Center Campus
Partially operational · Sterling, Virginia, United States
CyrusOne NVA5–NVA7 Sterling Data Center Campus, also known as CyrusOne NVA5–NVA7, is a partially operational data center campus in Sterling, VA, US associated with CyrusOne. More than 1.17 million square feet; 116 MW total IT capacity across the campus. Two large multi-story buildings with direct internet-exchange access, closed-loop cooling and multilayer security.
Projects sharing a market, utility, or organization.
Partially operational · Sterling, Virginia, United States
Partially operational · Sterling, Virginia, United States
Partially operational · Sterling, Virginia, United States
Partially operational · Sterling, Virginia, United States
116 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.
116 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.
Direct access to major interconnection ecosystems, closed-loop cooling, efficient chillers and extensive onsite security.
CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.
Two large multi-story buildings with direct internet-exchange access, closed-loop cooling and multilayer security.
Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.
No map point available
Published claims and their source links.