CyrusOne NVA5–NVA7 Sterling Data Center Campus

Sterling, Virginia, United StatesPartially operational
Capacity
116 MW
Planned / design
Lead participant
CyrusOne
Developer
Last updated
Aug 30, 2026
Most recent public record update

About CyrusOne NVA5–NVA7 Sterling Data Center Campus

CyrusOne NVA5–NVA7 Sterling Data Center Campus, also known as CyrusOne NVA5–NVA7, is a partially operational data center campus in Sterling, VA, US associated with CyrusOne. More than 1.17 million square feet; 116 MW total IT capacity across the campus. Two large multi-story buildings with direct internet-exchange access, closed-loop cooling and multilayer security.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load116 MWDesign · CyrusOne NVA5–NVA7 Sterling Data Center Campus
Design116 MWDesign · CyrusOne NVA5–NVA7 Sterling Data Center Campus
Design116 MWDesign · CyrusOne NVA5–NVA7 Sterling Data Center Campus
Design116 MWDesign · CyrusOne NVA5–NVA7 Sterling Data Center Campus

Development

2 phases · 3 milestones
Operating facility and documented expansionOperational

116 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Operating facility and documented expansionPartially Operational

116 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Primary project source reviewed for CyrusOne NVA5–NVA7
Completed
Aug 28, 2026
Current source record reviewed for CyrusOne NVA5–NVA7
Completed
Aug 30, 2026
Design capacity reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

Direct access to major interconnection ecosystems, closed-loop cooling, efficient chillers and extensive onsite security.

Cooling SystemOperational

CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.

Electric GridEnergized

Two large multi-story buildings with direct internet-exchange access, closed-loop cooling and multilayer security.

Cooling SystemOperational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 2Cooling & water: 2

Facts & sources

Published claims and their source links.

21 facts
Location Context
CyrusOne NVA5–NVA7 | Sterling | VA | US
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
116 MW
Design
Capacity Basis
CyrusOne publishes 116 MW of critical IT capacity for this record boundary.
Actual
Location Context
CyrusOne NVA5–NVA7 | Sterling | VA | US
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
116 MW
Design
Capacity Basis
116 MW facility or campus design capacity.
Actual
Technical Area
1,177,019 square feet
Actual
Record Facilities
3 facilities
Actual
Physical Buildings
2
Actual
Location Context
CyrusOne NVA5–NVA7 | Sterling | VA | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
116 MW
Design
Capacity Basis
116 MW facility or campus IT design capacity.
Actual
Reported Capacity
116 MW
Design
Project Identity
CyrusOne NVA5–NVA7
Actual
Location Context
Sterling, VA, US
Actual
Lifecycle Status
Partially operational
Actual
Development Detail
More than 1.17 million square feet; 116 MW total IT capacity across the campus.
Actual
Capacity Basis
116 MW facility or campus IT design capacity.
Actual