Arizona data center projects

Compare Arizona records at the site level rather than treating every location as one development market. Keep the named locality, project scope and evidence date alongside each capacity or schedule claim.

28 site records in current Cartis coverage

Coverage describes the records available here, not a complete market inventory. State-level program and energy-asset records are excluded from this site count. Capacity values are not summed across unlike stages or overlapping scopes.

Browse all Arizona sites

How to compare this coverage

  • Use the named site and locality to distinguish projects before comparing schedules or participants.
  • For proposed or phased developments, read milestone qualifiers and supporting sources; planned capacity is not a statement that the site is operating.
  • Open a profile for dated source citations, milestone precision and participant roles. A record review date is not a commissioning date.
Read the research methodology

Localities represented in these records

3700–3716 S. Avondale Boulevard, Avondale · 45 South Bullard Avenue, Goodyear · Avondale · Buckeye · Chandler · Florence · Gilbert · Glendale · Goodyear · Mesa · Mesa / Elliot and Sossaman roads · Phoenix · Pinal · Scottsdale · Tempe · Tucson

Selected site profiles

A starting point for comparison, not a ranking or investment recommendation. The full directory contains every currently matched site.

Project Blue

Tucson, Arizona, United States

Read the sourced project summary

Project Blue is Beale Infrastructure’s data-center campus on approximately 290 acres north of the Pima County Fairgrounds in unincorporated Pima County, Arizona. The developer acquired the County land on December 24, 2025. County materials describe approximately ten buildings and up to $3.6 billion in planned capital investment. The Arizona Corporation Commission approved Tucson Electric Power’s electric-service agreement in December 2025 for an initial 286 MW of utility service. Beale’s current project timeline records a first-quarter 2026 construction start and targets phase-one completion in 2028. The developer describes an air-cooled, closed-loop design and estimates average water use of 15,000–20,000 gallons per day, primarily for domestic building needs and fire protection. Beale’s current project listing describes an expected capacity of 600 MW; the listing does not specify whether this is IT or gross facility capacity. This is separate from the initial 286 MW electric-service agreement.

Recorded status
construction
Capacity evidence
— — Not disclosed
View profile and source evidence

Aligned Phoenix PHX01–PHX03 Data Center Campus

Phoenix, Arizona, United States

Read the sourced project summary

Aligned Phoenix PHX01–PHX03 Data Center Campus, also known as Aligned Phoenix Campus, is a data center project in Phoenix, AZ, US associated with Aligned Data Centers. PHX01, PHX02 and PHX03; approximately 550,000 square feet; 180 MW+ published capacity. Large Southwest campus with adaptive air and liquid cooling and scalable high-density infrastructure.

Recorded status
partially operational
Capacity evidence
180 MW — Planned critical IT
View profile and source evidence

Ark Tucson Data Center

Tucson, Arizona, United States

Read the sourced project summary

Ark Tucson Data Center is an operating Ark Data Centers data-center facility in Tucson, Arizona. Ark's operating Tucson physical facility, opened in 2013, with current capacity separated from historical expansion claims. The retrofit records facility power capacity: 2072 kW; conditioned data center area: 20,000 sq ft. Utility service, UPS, standby generation, cooling, facility power and IT load are kept in their source-defined scopes rather than collapsed into one capacity number. Where reliable public evidence for ownership, project financing, permitting, tenants or water arrangements was not established, Cartis records the research gap explicitly instead of inferring a fact.

Recorded status
operating
Capacity evidence
2.1 MW — Planned / design
View profile and source evidence

Compass Goodyear Data Center Campus

Goodyear, Arizona, United States

Read the sourced project summary

Compass began the Goodyear campus with two data-center buildings totaling 72 MW of IT design capacity and a first four-building series planned for 144 MW. The campus was designed around an onsite 230 kV substation and an expansion envelope of up to 350 MW. Compass’s current market material describes a 212 MW Goodyear campus, which supersedes

Recorded status
operating
Capacity evidence
212 MW — Planned / design
View profile and source evidence

CyrusOne PHX1–PHX8 Chandler Data Center Campus

Chandler, Arizona, United States

Read the sourced project summary

CyrusOne PHX1–PHX8 Chandler Data Center Campus, also known as CyrusOne Chandler Campus, is a partially operational data center campus in Chandler, AZ, US associated with CyrusOne. Eight-facility campus; approximately 2 million square feet; 169 MW total IT capacity. Large Southwest campus with zero-water cooling, redundant power distribution, robust fiber and high-density capability.

Recorded status
partially operational
Capacity evidence
169 MW — Planned critical IT
View profile and source evidence

EdgeConneX Phoenix Data Center

Tempe, Arizona, United States

Read the sourced project summary

EdgeConneX operates a Phoenix-area data center in Tempe near Arizona State University. The facility is positioned for low-latency regional delivery and cloud connectivity, with redundant electrical and mechanical systems and access to the greater Phoenix carrier ecosystem.

Recorded status
operating
Capacity evidence
— — Not disclosed
View profile and source evidence