Ark Tucson Data Center

Tucson, Arizona, United StatesOperating
Evidence
Planned / design
2.1 MW
Updated
Oct 28, 2026

Ark Tucson Data Center is an operating Ark Data Centers data center facility in Tucson, Arizona. Ark's operating Tucson physical facility, opened in 2013, with current capacity separated from historical expansion claims. The retrofit records facility power capacity: 2072 kW; conditioned data center area: 20,000 sq ft. Utility service, UPS, standby generation, cooling, facility power and IT load are kept in their source-defined scopes rather than collapsed into one capacity number. Where reliable public evidence for ownership, project financing, permitting, tenants or water arrangements was not established, Cartis records the research gap explicitly instead of inferring a fact.

Capacity

Facility power capacity

Planned / design or future potential

2,072 kW

Source

Historical capacity claim

Planned / design or future potential

1,000 kW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Tucson facilityOperational

Operating data center facility.

Milestones (4)
Operator history reports purchase of the Tucson property in August 2012.

Aug 2012 · Recorded actual event

property acquired

Completed · Land acquired

Sources (1)
Operator history reports Tucson facility opening in January 2013.

Jan 2013 · Recorded actual event

facility opened

Completed · Commercial operation

Sources (1)
Ark announced an expansion that increased stated capacity to 1.0 MW at that date.

Dec 14, 2023 · Recorded actual event

capacity expansion announced

Completed · Capacity revised

Sources (1)
Ark announced completion of a Tucson capacity expansion

May 20, 2025 · Recorded actual event

Completed · Capacity revised

Source not linked

Participants

Ark Data Centers

Operator

Sources by role
Operator (1)
Operator (1)

Site & development

Building area

Actual

38,000 sq. ft.

Source

Conditioned data center area

Actual

20,000 sq. ft.

Source

Technical specifications

Rack capacity

Actual

600 racks

Source

Infrastructure & permits

Technical details (4)
Onsite generation

Operational

1,000 kW

Diesel generator, N+1.

Cooling system

Operational

DX cooling with N+1 CRACs.

Electric grid

Operational

Diverse utility feeds; no service capacity inferred.

Fiber

Operational

Multiple-carrier redundant fiber.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (1)
Project Blue

Under construction · Tucson, Arizona, United States

Same locality: Tucson