Aligned Phoenix PHX01–PHX03 Data Center Campus

Phoenix, Arizona, United StatesPartially operational
Capacity
180 MW
Planned / design
Lead participant
Aligned Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Aligned Phoenix PHX01–PHX03 Data Center Campus

Aligned Phoenix PHX01–PHX03 Data Center Campus, also known as Aligned Phoenix Campus, is a data center project in Phoenix, AZ, US associated with Aligned Data Centers. PHX01, PHX02 and PHX03; approximately 550,000 square feet; 180 MW+ published capacity. Large Southwest campus with adaptive air and liquid cooling and scalable high-density infrastructure.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load180 MWDesign · Aligned Phoenix PHX01–PHX03 Data Center Campus
Design180 MWDesign · Aligned Phoenix PHX01–PHX03 Data Center Campus

Development

1 phases · 2 milestones
Operating facility and documented expansionPartially Operational

180 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Dec 10, 2021
Current source record reviewed for Aligned Phoenix Campus
Completed
Aug 30, 2026
Operating boundary reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

Large Southwest campus with adaptive air and liquid cooling and scalable high-density infrastructure.

Cooling SystemOperational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Electric GridEnergized

Five diverse utility entry points and closed-loop cooling support PHX01–PHX03.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 2Cooling & water: 1

Facts & sources

Published claims and their source links.

11 facts
Location Context
Aligned Phoenix Campus | Phoenix | AZ | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
180 MW
Design
Capacity Basis
Aligned Data Centers publishes 180 MW of critical IT capacity for this record boundary.
Actual
Location Context
Aligned Phoenix Campus | Phoenix | AZ | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
180 MW
Design
Capacity Basis
180 MW facility or campus design capacity.
Actual
Site Area
55 acres
Actual
Building Area
550,000 square feet
Design
Utility Entries
5 entries
Design