Microsoft Goodyear Data Center Campus
Operating / Stabilized · Goodyear, Arizona, United States
Same locality: Goodyear
Compass began the Goodyear campus with two data center buildings totaling 72 MW of IT design capacity and a first four-building series planned for 144 MW. The campus was designed around an onsite 230 kV substation and an expansion envelope of up to 350 MW. Compass’s current market material describes a 212 MW Goodyear campus, which supersedes
Projects sharing a market, utility, or organization.
Operating / Stabilized · Goodyear, Arizona, United States
First two buildings designed for 72 MW combined.
Ongoing expansion within the current 212 MW campus design.
230 kV
Onsite high-voltage substation supports phased campus delivery.