Data center siteSite record

CyrusOne LON1 Slough Data Center

Slough, England, United KingdomOperating / Stabilized
Capacity
9 MW
Planned / design
Lead participant
CyrusOne
Developer
Last updated
Aug 28, 2026
Most recent public record update

About CyrusOne LON1 Slough Data Center

CyrusOne LON1 Slough Data Center, also known as CyrusOne LON1, is a data center project in Slough, England, GB developed and operated by CyrusOne. Two-story Slough facility with 4,309 square metres of technical space and 8.72 MW of total IT capacity. Active-active power supplies, indirect adiabatic cooling, detailed facility monitoring and onsite engineering support. CyrusOne currently rounds LON1 to 9 MW; the prior facility sheet reported 8.72 MW. This is a facility design boundary, not measured tenant draw.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load8.7 MWDesign · CyrusOne LON1 Slough Data Center
Design9 MWDesign · CyrusOne LON1 Slough Data Center

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

CyrusOne currently rounds LON1 to 9 MW; the prior facility sheet reported 8.72 MW. This is a facility design boundary, not measured tenant draw.

Aug 28, 2026
Current source record reviewed for CyrusOne LON1
Completed

Infrastructure

Electric GridEnergized

Active-active power supplies, indirect adiabatic cooling, detailed facility monitoring and onsite engineering support.

Cooling SystemOperational

CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
CyrusOne LON1 | Slough | England | GB
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
8.72 MW
Design
Capacity Basis
CyrusOne publishes 8.72 MW of critical IT capacity for this record boundary.
Actual
Location Context
CyrusOne LON1 | Slough | England | GB
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
9 MW
Design
Capacity Basis
CyrusOne currently rounds LON1 to 9 MW; the prior facility sheet reported 8.72 MW. This is a facility design boundary, not measured tenant draw.
Actual
Project Boundary
CyrusOne LON1
Actual
Location Context
Slough, England, GB
Actual
Lifecycle Status
Operating
Actual
Capacity Basis
CyrusOne currently rounds LON1 to 9 MW; the prior facility sheet reported 8.72 MW. This is a facility design boundary, not measured tenant draw.
Actual