STACK MIL07 Pavia Data Center Campus
Preconstruction · Pavia, Lombardy, Italy
STACK MIL04 is the four-building Vellezzo Bellini campus in Pavia. Building cards total 64 MW, while current campus prose and the independent register describe 60 MW. Cartis publishes the location, four-building plan and infrastructure context but withholds the headline until STACK reconciles the campus total. The capacity or identity headline remains held until the named conflict is resolved; no automatic merge is authorized.
Projects sharing a market, utility, or organization.
Preconstruction · Pavia, Lombardy, Italy
Partially operational · Milan, Lombardy, Italy
Partially operational · Milan, Lombardy, Italy
Partially operational · Milan, Lombardy, Italy
No additional capacity claims are published.
STACK MIL04 is the four-building Vellezzo Bellini campus in Pavia. Building cards total 64 MW, while current campus prose and the independent register describe 60 MW. Cartis publishes the location, four-building plan and infrastructure context but withholds the headline until STACK reconciles the campus total. The capacity or identity headline remains held until the named conflict is resolved; no automatic merge is authorized.
The four published building figures sum to 64 MW, while current independent and first-party campus prose also says 60 MW. The headline is withheld pending a reconciled operator specification.
Dedicated campus power and connectivity with four buildings ranging from 10 MW to 24 MW.
Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.
No map point available
Published claims and their source links.