STACK MIL04 Pavia Data Center Campus

Pavia, Lombardy, ItalyPartially operational
Capacity
No public figure
Lead participant
STACK Infrastructure
Developer
Last updated
Aug 28, 2026
Most recent public record update

About STACK MIL04 Pavia Data Center Campus

STACK MIL04 is the four-building Vellezzo Bellini campus in Pavia. Building cards total 64 MW, while current campus prose and the independent register describe 60 MW. Cartis publishes the location, four-building plan and infrastructure context but withholds the headline until STACK reconciles the campus total. The capacity or identity headline remains held until the named conflict is resolved; no automatic merge is authorized.

Projects sharing a market, utility, or organization.

4 related

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

STACK MIL04 is the four-building Vellezzo Bellini campus in Pavia. Building cards total 64 MW, while current campus prose and the independent register describe 60 MW. Cartis publishes the location, four-building plan and infrastructure context but withholds the headline until STACK reconciles the campus total. The capacity or identity headline remains held until the named conflict is resolved; no automatic merge is authorized.

Aug 29, 2026
Project-specific evidence refreshed and reconciled
Completed

Infrastructure

Electric GridOperational

The four published building figures sum to 64 MW, while current independent and first-party campus prose also says 60 MW. The headline is withheld pending a reconciled operator specification.

FiberOperational

Dedicated campus power and connectivity with four buildings ranging from 10 MW to 24 MW.

Cooling SystemOperational

Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

14 facts
Location Context
STACK MIL04 | Pavia | Lombardy | IT
Actual
Lifecycle Status
Partially operational
Actual
Capacity Basis
STACK Infrastructure publishes 64 MW of critical IT capacity for this record boundary.
Actual
Location Context
STACK MIL04 | Pavia | Lombardy | IT
Actual
Lifecycle Status
Partially operational
Actual
Operator Or Developer
STACK Infrastructure
Actual
Project Location
Pavia, Lombardy, IT
Actual
Current Lifecycle
Operating or in phased operation
Actual
Capacity Classification
Design
Actual
Capacity Basis
The four published building figures sum to 64 MW, while current independent and first party campus prose also says 60 MW. The headline is withheld pending a reconciled operator specification.
Actual
Customer Utilization
Not publicly disclosed
Actual
Source Refresh Date
2026-08-29
Actual
Building Count
4
Design
Published Capacity Conflict
60–64 MW
Reported Rounded