STACK MIL04 Pavia Data Center Campus
- Headline capacity
- Not established in published records
- Updated
- Oct 28, 2026
STACK MIL04 is the four-building Vellezzo Bellini campus in Pavia. Building cards total 64 MW, while current campus prose and the independent register describe 60 MW. Cartis publishes the location, four-building plan and infrastructure context but withholds the headline until STACK reconciles the campus total. The capacity or identity headline remains held until the named conflict is resolved; no automatic merge is authorized.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
STACK MIL04 is the four-building Vellezzo Bellini campus in Pavia. Building cards total 64 MW, while current campus prose and the independent register describe 60 MW. Cartis publishes the location, four-building plan and infrastructure context but withholds the headline until STACK reconciles the campus total. The capacity or identity headline remains held until the named conflict is resolved; no automatic merge is authorized.
Milestones (1)
Aug 29, 2026 · Recorded actual event
Completed · Status changed
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- STACK Infrastructure STACK MIL04 profile · Aug 28, 2026 · Primary
Site & development
Additional project facts
Capacity basis
ActualSTACK Infrastructure publishes 64 MW of critical IT capacity for this record boundary.
SourceCapacity basis
ActualThe four published building figures sum to 64 MW, while current independent and first party campus prose also says 60 MW. The headline is withheld pending a reconciled operator specification.
SourceInfrastructure & permits
Technical details (3)
Operational
The four published building figures sum to 64 MW, while current independent and first-party campus prose also says 60 MW. The headline is withheld pending a reconciled operator specification.
Operational
Dedicated campus power and connectivity with four buildings ranging from 10 MW to 24 MW.
Operational
Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (4)
Preconstruction · Pavia, Lombardy, Italy
Same locality: Pavia · Shared participant: STACK Infrastructure
Compare in a collectionPartially operational · Milan, Lombardy, Italy
Shared participant: STACK Infrastructure · Same market: Lombardy, Italy
Compare in a collectionPartially operational · Milan, Lombardy, Italy
Shared participant: STACK Infrastructure · Same market: Lombardy, Italy
Compare in a collectionPreconstruction · Milan, Lombardy, Italy
Shared participant: STACK Infrastructure · Same market: Lombardy, Italy
Compare in a collection