IREN Sweetwater 1 Data Center Campus

Sweetwater area, Texas, United StatesUnder construction
Capacity
1,400 MW
Utility capacity
Lead participant
IREN
Developer
Last updated
Aug 27, 2026
Most recent public record update

About IREN Sweetwater 1 Data Center Campus

IREN is developing Sweetwater 1 as the larger anchor of its West Texas AI and compute hub. The 1.4 GW figure is the site power envelope; it is not operating critical IT capacity. IREN is publicly identified in the project record for Sweetwater area, Nolan County area, TX, US. The disclosed development record includes 1,400 MW grid-connected power envelope; more than 1,300 acres across the Sweetwater hub; bulk substation energized in 2026. Power and infrastructure include 345 kV/138 kV bulk substation, primary substations and planned fiber loop to Sweetwater 2. IREN identifies 1,400 MW of secured grid capacity at Sweetwater 1; site delivery remains phased.

Projects sharing a market, utility, or organization.

2 related

Capacity

Utility capacity
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Utility Service1,400 MWDesign · IREN Sweetwater 1 Data Center Campus

Development

1 phases · 2 milestones
Construction programUnder Construction

Project-wide phase for IREN Sweetwater 1 Data Center Campus; capacity remains classified as utility service.

Aug 29, 2025
Sweetwater 1 project status and capacity disclosed
Completed
Bulk substation energized; initial AI capacity in build
Forecast

Infrastructure

Electric GridPlanned Or Represented

1,400 MW

IREN identifies 1,400 MW of secured grid capacity at Sweetwater 1; site delivery remains phased.

Site FacilityPlanned Or Represented

345 kV/138 kV bulk substation, primary substations and planned fiber loop to Sweetwater 2.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Site systems: 1

Facts & sources

Published claims and their source links.

8 facts
Location Context
Sweetwater 1 campus | approximately 40 miles from Abilene | West Texas
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
1,400 MW
Design
Capacity Basis
IREN identifies 1,400 MW of secured grid capacity at Sweetwater 1; site delivery remains phased.
Actual
Development Scale
1,400 MW grid connected power envelope
Actual
Development Milestone
More than 1,300 acres across the Sweetwater hub
Actual
Power Arrangement
Bulk substation energized in 2026.
Actual
Boundary Context
Sweetwater 1 campus | approximately 40 miles from Abilene | West Texas
Actual