IREN Sweetwater 2 Data Center Campus
Preconstruction · Sweetwater area, Texas, United States
IREN is developing Sweetwater 1 as the larger anchor of its West Texas AI and compute hub. The 1.4 GW figure is the site power envelope; it is not operating critical IT capacity. IREN is publicly identified in the project record for Sweetwater area, Nolan County area, TX, US. The disclosed development record includes 1,400 MW grid-connected power envelope; more than 1,300 acres across the Sweetwater hub; bulk substation energized in 2026. Power and infrastructure include 345 kV/138 kV bulk substation, primary substations and planned fiber loop to Sweetwater 2. IREN identifies 1,400 MW of secured grid capacity at Sweetwater 1; site delivery remains phased.
Projects sharing a market, utility, or organization.
Preconstruction · Sweetwater area, Texas, United States
Under construction · Childress, Texas, United States
Project-wide phase for IREN Sweetwater 1 Data Center Campus; capacity remains classified as utility service.
1,400 MW
IREN identifies 1,400 MW of secured grid capacity at Sweetwater 1; site delivery remains phased.
345 kV/138 kV bulk substation, primary substations and planned fiber loop to Sweetwater 2.
No map point available
Published claims and their source links.