IREN Sweetwater 1 Data Center Campus

Sweetwater area, Texas, United StatesUnder construction
Evidence
Utility capacity
1,400 MW
Updated
Oct 28, 2026

IREN’s September 8, 2026 update said Sweetwater 1 was conditionally classified as Base Load and described its first 300 MW gross data center development as under construction for delivery in the fourth quarter of 2027. The classification remains conditional; neither it nor the energized bulk substation proves operating AI IT capacity. IREN is developing Sweetwater 1 as the larger anchor of its West Texas AI and compute hub. The 1.4 GW figure is the site power envelope; it is not operating critical IT capacity. IREN is publicly identified in the project record for Sweetwater area, Nolan County area, TX, US. The disclosed development record includes 1,400 MW grid-connected power envelope; more than 1,300 acres across the Sweetwater hub; bulk substation energized in 2026. Power and infrastructure include 345 kV/138 kV bulk substation, primary substations and planned fiber loop to Sweetwater 2. IREN identifies 1,400 MW of secured grid capacity at Sweetwater 1; site delivery remains phased.

Capacity

Reported capacity

Design

1,400 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Construction programUnder construction

Project-wide phase for IREN Sweetwater 1 Data Center Campus; capacity remains classified as utility service.

Milestones (2)
Sweetwater 1 project status and capacity disclosed

Aug 29, 2025 · Recorded actual event

Completed · Announced

Source not linked
Bulk substation energized; initial AI capacity in build

Date not disclosed · Forecast / planned record

Forecast · Forecast completion

Source not linked

Participants

IREN

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Sweetwater 1 campus | approximately 40 miles from Abilene | West Texas

Source

Development scale

Actual

1,400 MW grid connected power envelope

Source

Development milestone

Actual

More than 1,300 acres across the Sweetwater hub

Source

Technical specifications

Power arrangement

Actual

Bulk substation energized in 2026.

Source

Additional project facts

Lifecycle status

Actual

Construction

Source

Capacity basis

Actual

IREN identifies 1,400 MW of secured grid capacity at Sweetwater 1; site delivery remains phased.

Source

Boundary context

Actual

Sweetwater 1 campus | approximately 40 miles from Abilene | West Texas

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

1,400 MW

IREN identifies 1,400 MW of secured grid capacity at Sweetwater 1; site delivery remains phased.

Site facility

Planned or represented

345 kV/138 kV bulk substation, primary substations and planned fiber loop to Sweetwater 2.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (2)
IREN Sweetwater 2 Data Center Campus

Preconstruction · Sweetwater area, Texas, United States

Same locality: Sweetwater area · Shared participant: IREN

Compare in a collection
IREN Childress Horizon AI Data Center Campus

Partially operational · Childress, Texas, United States

Shared developer: IREN · Same market: Texas, United States

Compare in a collection