Skip to content
All records
Data center siteSite record

CyrusOne HOU3–HOU4 Houston Data Center Campus

Houston, Texas, United StatesPartially operational
Capacity
84 MW
Planned / design
Lead participant
CyrusOne
Developer
Last updated
Aug 30, 2026
Most recent public record update

About CyrusOne HOU3–HOU4 Houston Data Center Campus

CyrusOne HOU3–HOU4 Houston Data Center Campus, also known as CyrusOne Houston Campus, is a partially operational data center campus in Houston, TX, US associated with CyrusOne. Dual-facility campus; 347,000 square feet of technical space; 84 MW total IT capacity. Dual-facility technology-corridor campus with closed-loop cooling, extensive backup generation and layered security.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load84 MWDesign · CyrusOne HOU3–HOU4 Houston Data Center Campus
Design84 MWDesign · CyrusOne HOU3–HOU4 Houston Data Center Campus
Design84 MWDesign · CyrusOne HOU3–HOU4 Houston Data Center Campus

Development

2 phases · 3 milestones
Operating facility and documented expansionOperational

CyrusOne current marketing reports 84 MW for HOU3–HOU4, while the independent facility register totals 91 MW. The available public sources do not establish a single project-scoped capacity figure.

Operating facility and documented expansionPartially Operational

84 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.

Dec 31, 2024
HOU4 built out during 2024
Completed
Aug 27, 2026
Primary project source reviewed for CyrusOne Houston Campus
Completed
Aug 30, 2026
Design capacity reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

Air-cooled chillers with closed-loop water systems, multiple redundancy levels, 68 dedicated generators and multilayer security.

Cooling SystemOperational

CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.

Electric GridEnergized

Dual-facility technology-corridor campus with closed-loop cooling, extensive backup generation and layered security.

Cooling SystemOperational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 2Cooling & water: 2

Facts & sources

Published claims and their source links.

17 facts
Location Context
CyrusOne HOU3–HOU4 | Houston | TX | US
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
84 MW
Design
Capacity Basis
CyrusOne publishes 84 MW of critical IT capacity for this record boundary.
Actual
Location Context
CyrusOne HOU3–HOU4 | Houston | TX | US
Actual
Lifecycle Status
Operating
Actual
Technical Area
347,000 square feet
Actual
Facility Count
2 facilities
Actual
Built Out In 2024
HOU4
Actual
Location Context
CyrusOne Houston Campus | Houston | TX | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
84 MW
Design
Capacity Basis
84 MW facility or campus IT design capacity.
Actual
Campus It Design
84 MW
Design
Technical Area
347,000 square feet
Design
Hou3 Fitout Area
250,000 square feet
Actual
Hou3 Fitout Cost
$57,000,000
Transaction Scope