CyrusOne HOU3–HOU4 Houston Data Center Campus

Houston, Texas, United StatesPartially operational
Evidence
Planned critical IT
84 MW
Updated
Oct 28, 2026

CyrusOne HOU3–HOU4 Houston Data Center Campus, also known as CyrusOne Houston Campus, is a partially operational data center campus in Houston, TX, US associated with CyrusOne. Dual-facility campus; 347,000 square feet of technical space; 84 MW total IT capacity. Dual-facility technology-corridor campus with closed-loop cooling, extensive backup generation and layered security.

Capacity

Reported capacity

Design

84 MW

Source

Reported capacity

Planned / design or future potential

84 MW

Source

Campus IT design

Planned / design or future potential

84 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

CyrusOne current marketing reports 84 MW for HOU3–HOU4, while the independent facility register totals 91 MW. The available public sources do not establish a single project-scoped capacity figure.

Operating facility and documented expansionPartially operational

84 MW is the operator-published facility or campus IT design boundary.

Milestones (1)
HOU4 built out during 2024

2024 · Recorded actual event

Completed · Construction completed

Source not linked

Participants

CyrusOne

Developer

Sources by role
Developer (1)

Capital & incentives

Capital claims and financing records may overlap. Their amounts are not added together.

Capital claims

Hou3 fitout cost

Transaction scope

$57,000,000

Source

Financing records

Investment commitment

$57m

Aug 3, 2022

TDLR estimate for the HOU3 fit-out, not total campus investment or a financing close.

Parties & sources

CyrusOne (Borrower)

Sources (1)

Site & development

Location context

Actual

CyrusOne HOU3–HOU4 | Houston | TX | US

Source

Location context

Actual

CyrusOne HOU3–HOU4 | Houston | TX | US

Source

Technical area

Actual

347,000 square feet

Source

Location context

Actual

CyrusOne Houston Campus | Houston | TX | US

Source

Technical area

Design

347,000 square feet

Source

Hou3 fitout area

Actual

250,000 square feet

Source

Additional project facts

Lifecycle status

Actual

Operational

Source

Capacity basis

Actual

CyrusOne publishes 84 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Operating

Source

Facility count

Actual

2 facilities

Source

Built out in 2024

Actual

HOU4

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

84 MW facility or campus IT design capacity.

Source

Infrastructure & permits

Technical details (4)
Electric grid

Energized

Air-cooled chillers with closed-loop water systems, multiple redundancy levels, 68 dedicated generators and multilayer security.

Cooling system

Operational

CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.

Electric grid

Energized

Dual-facility technology-corridor campus with closed-loop cooling, extensive backup generation and layered security.

Cooling system

Operational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Building · Documented

CyrusOne HOU3

Texas Department of Licensing and Regulation

Aug 3, 2022

Sources (1)

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
CyrusOne AUS2–AUS3 Austin Data Center Campus

Partially operational · Austin, Texas, United States

Shared participant: CyrusOne · Same market: Texas, United States

Compare in a collection
CyrusOne Bosque Powered Campus

Under construction · Whitney / Clifton, Texas, United States

Shared participant: CyrusOne · Same market: Texas, United States

Compare in a collection
CyrusOne DFW1 Carrollton Data Center

Partially operational · Carrollton, Texas, United States

Shared participant: CyrusOne · Same market: Texas, United States

Compare in a collection
CyrusOne DFW2 Lewisville Data Center

Partially operational · Lewisville, Texas, United States

Shared participant: CyrusOne · Same market: Texas, United States

Compare in a collection