CyrusOne DFW2 Lewisville Data Center

Lewisville, Texas, United StatesPartially operational
Capacity
12 MW
Planned / design
Lead participant
CyrusOne
Developer
Last updated
Aug 30, 2026
Most recent public record update

About CyrusOne DFW2 Lewisville Data Center

CyrusOne DFW2 Lewisville Data Center, also known as CyrusOne DFW2, is a partially operational data center campus in Lewisville, TX, US associated with CyrusOne. Approximately 200,000 square feet of IT space; 12 MW total IT capacity. Dallas-area colocation facility with two independent power grids, high-efficiency cooling and major fiber access.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load12 MWDesign · CyrusOne DFW2 Lewisville Data Center
Design12 MWDesign · CyrusOne DFW2 Lewisville Data Center
Design12 MWDesign · CyrusOne DFW2 Lewisville Data Center
Design12 MWDesign · CyrusOne DFW2 Lewisville Data Center

Development

2 phases · 3 milestones
Operating facility and documented expansionOperational

12 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Operating facility and documented expansionPartially Operational

12 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Primary project source reviewed for CyrusOne DFW2
Completed
Aug 28, 2026
Current source record reviewed for CyrusOne DFW2
Completed
Aug 30, 2026
Design capacity reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

Two independent power grids, chilled-water cooling, high-density support and diverse regional connectivity.

Cooling SystemOperational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Electric GridEnergized

Dallas-area colocation facility with two independent power grids, high-efficiency cooling and major fiber access.

Cooling SystemOperational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 2Cooling & water: 2

Facts & sources

Published claims and their source links.

21 facts
Location Context
CyrusOne DFW2 | Lewisville | TX | US
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
12 MW
Design
Capacity Basis
CyrusOne publishes 12 MW of critical IT capacity for this record boundary.
Actual
Location Context
CyrusOne DFW2 | Lewisville | TX | US
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
12 MW
Design
Capacity Basis
12 MW facility or campus design capacity.
Actual
Project Boundary
CyrusOne DFW2
Actual
Location Context
Lewisville, TX, US
Actual
Lifecycle Status
Operating
Actual
Development Detail
Dallas area facility; nearly 200,000 square feet of technical IT space; 12 MW total IT capacity.
Actual
Capacity Basis
12 MW facility or campus design capacity.
Actual
Location Context
CyrusOne DFW2 | Lewisville | TX | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
12 MW
Design
Capacity Basis
12 MW facility or campus IT design capacity.
Actual
Facility It Design
12 MW
Design
It Space
200,000 square feet
Design
Documented Project
Data Hall 10 conversion
Actual
Utility Grids
2 independent grids
Design