CyrusOne DFW1 Carrollton Data Center

Carrollton, Texas, United StatesPartially operational
Capacity
45 MW
Planned / design
Lead participant
CyrusOne
Developer
Last updated
Aug 30, 2026
Most recent public record update

About CyrusOne DFW1 Carrollton Data Center

CyrusOne DFW1 Carrollton Data Center, also known as CyrusOne DFW1, is a partially operational data center campus in Carrollton, TX, US associated with CyrusOne. 600,000 square feet of technical space; 45 MW total IT capacity. Large Dallas-area facility with zero-water cooling, high-density capability and resilient security systems.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load45 MWDesign · CyrusOne DFW1 Carrollton Data Center
Design45 MWDesign · CyrusOne DFW1 Carrollton Data Center
Design45 MWDesign · CyrusOne DFW1 Carrollton Data Center
Design45 MWDesign · CyrusOne DFW1 Carrollton Data Center

Development

2 phases · 3 milestones
Operating facility and documented expansionOperational

45 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Operating facility and documented expansionPartially Operational

45 MW is the operator-published facility or campus IT design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Primary project source reviewed for CyrusOne DFW1
Completed
Aug 28, 2026
Current source record reviewed for CyrusOne DFW1
Completed
Aug 30, 2026
Design capacity reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

Independent power grids, zero-water cooling, high-density support and extensive physical security systems.

Cooling SystemOperational

CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.

Electric GridEnergized

Large Dallas-area facility with zero-water cooling, high-density capability and resilient security systems.

Cooling SystemOperational

Cooling and efficiency claims remain limited to source-defined designs; no delivered load or water use is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 2Cooling & water: 2

Facts & sources

Published claims and their source links.

22 facts
Location Context
CyrusOne DFW1 | Carrollton | TX | US
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
45 MW
Design
Capacity Basis
CyrusOne publishes 45 MW of critical IT capacity for this record boundary.
Actual
Location Context
CyrusOne DFW1 | Carrollton | TX | US
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
45 MW
Design
Capacity Basis
45 MW facility or campus design capacity.
Actual
Project Boundary
CyrusOne DFW1
Actual
Location Context
Carrollton, TX, US
Actual
Lifecycle Status
Operating
Actual
Capacity Basis
45 MW facility or campus design capacity.
Actual
Location Context
CyrusOne DFW1 | Carrollton | TX | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
45 MW
Design
Capacity Basis
45 MW facility or campus IT design capacity.
Actual
Reported Capacity
45 MW
Design
Project Identity
CyrusOne DFW1
Actual
Location Context
Carrollton, TX, US
Actual
Lifecycle Status
Partially operational
Actual
Development Detail
600,000 Square feet of technical space; 45 MW total IT capacity.
Actual
Capacity Basis
45 MW facility or campus IT design capacity.