Crow Holdings–CleanArc Stemmons Data Center Campus
Preconstruction · Dallas, Texas, United States
Shared participant: CleanArc Data CentersShared participant: Crow HoldingsSame market: Texas, United States
Crow Holdings and CleanArc announced a multi-building data center campus on roughly 40 acres in central Dallas. The plan allows up to 245 MW, while the first 70 MW building is targeted for late 2027.
Projects sharing a market, utility, or organization.
Preconstruction · Dallas, Texas, United States
Turnkey power figure and target date; no start or energization verified.
1 building
Full design envelope supported by a dedicated on-site substation concept.
245 MW
Full multi-building turnkey campus envelope; not operating IT load.
70 MW
First-building turnkey figure targeted for late 2027.
Dedicated on-site substation concept; utility, voltage and interconnection status undisclosed.