Vantage ZRH2 Zurich Campus

PRJ-0024 · Site · Glattfelden / Zurich region, ZH, Switzerland

Captured 2026-09-06T04:13:38.764Z · Record last updated 2026-08-22

SHA-256: 88e8bf7d1f49ab2e2a83cf7589c306d3af75557d37e2a0b69f0af2bbab6a4339

Save a diligence baseline

Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.

The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.

Scope and capacity

Vantage's ZRH2 campus in Glattfelden is an operating 24 MW critical-IT facility launched in July 2024. It is one two-story building and is tracked independently from Vantage's ZRH1 campus.

Headline: 24 MW Planned critical IT

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Operational Status · Operating

actual · Vantage ZRH2 Zurich Campus (project)

Claim 3069 · Review: Approved · Claim date: 2024-07-18T00:00:00+00:00

  1. Vantage launches second data center in Switzerland

    Data Center Dynamics · Document date: 2024-07-18 · Corroborating

    https://www.datacenterdynamics.com/en/news/vantage-launches-second-data-center-in-switzerland/
  2. ZRH2 Zurich II data center campus

    Vantage Data Centers · Document date: Not published · Primary

    https://vantage-dc.com/data-center-locations/emea/zurich-ii-switzerland/

Site Address · Spinnerei Lettenstrasse, 8192 Glattfelden

actual · Vantage ZRH2 Zurich Campus (project)

Claim 3070 · Review: Approved · Claim date: Not published

  1. ZRH2 Zurich II data center campus

    Vantage Data Centers · Document date: Not published · Primary

    https://vantage-dc.com/data-center-locations/emea/zurich-ii-switzerland/
  2. Vantage Data Centers ZRH2 client directory profile

    BSI · Document date: Not published · Corroborating

    https://www.bsigroup.com/en-GB/products-and-services/assessment-and-certification/validation-and-verification/client-directory-profile/VDC_MA-0047915937-013/

Critical It Capacity · 24 MW

actual · Vantage ZRH2 Zurich Campus (project)

Claim 3071 · Review: Approved · Claim date: Not published

Headline treatment: Selected headline

  1. ZRH2 Zurich II data center campus

    Vantage Data Centers · Document date: Not published · Primary

    https://vantage-dc.com/data-center-locations/emea/zurich-ii-switzerland/

Building Count · 1 building

actual · Vantage ZRH2 Zurich Campus (project)

Claim 3072 · Review: Approved · Claim date: Not published

  1. ZRH2 Zurich II data center campus

    Vantage Data Centers · Document date: Not published · Primary

    https://vantage-dc.com/data-center-locations/emea/zurich-ii-switzerland/

Gross Floor Area · 21,000 sqm

actual · Vantage ZRH2 Zurich Campus (project)

Claim 3073 · Review: Approved · Claim date: Not published

  1. ZRH2 Zurich II data center campus

    Vantage Data Centers · Document date: Not published · Primary

    https://vantage-dc.com/data-center-locations/emea/zurich-ii-switzerland/

Site Area · 1 hectare

actual · Vantage ZRH2 Zurich Campus (project)

Claim 3074 · Review: Approved · Claim date: Not published

  1. ZRH2 Zurich II data center campus

    Vantage Data Centers · Document date: Not published · Primary

    https://vantage-dc.com/data-center-locations/emea/zurich-ii-switzerland/

Opening Event · Grand opening

actual · ZRH2 single-building campus (phase)

Claim 3076 · Review: Approved · Claim date: 2024-07-18T00:00:00+00:00 · Supersedes 3075

  1. Vantage launches second data center in Switzerland

    Data Center Dynamics · Document date: 2024-07-18 · Primary

    https://www.datacenterdynamics.com/en/news/vantage-launches-second-data-center-in-switzerland/

Site Investment · >370000000 CHF

transaction scope · Vantage ZRH2 Zurich Campus (project)

Claim 3077 · Review: Approved · Claim date: 2024-04-11T00:00:00+00:00

  1. Vantage expands EMEA portfolio with second Zurich campus

    Vantage Data Centers · Document date: 2024-04-11 · Primary

    https://vantage-dc.com/news/vantage-data-centers-expands-emea-portfolio-with-second-zurich-campus-fueled-by-more-than-chf-370-million-investment/

Cooling Design · Outside air with minimal water use

design · Vantage ZRH2 Zurich Campus (project)

Claim 3078 · Review: Approved · Claim date: Not published

  1. ZRH2 Zurich II data center campus

    Vantage Data Centers · Document date: Not published · Primary

    https://vantage-dc.com/data-center-locations/emea/zurich-ii-switzerland/

Heat Export Capability · Air and water heat pumps connected for district heat export

actual · Vantage ZRH2 Zurich Campus (project)

Claim 3079 · Review: Approved · Claim date: Not published

  1. ZRH2 Zurich II data center campus

    Vantage Data Centers · Document date: Not published · Primary

    https://vantage-dc.com/data-center-locations/emea/zurich-ii-switzerland/

Counterparties and capital

BSI · Contractor · CMP-0111

Gemeinde Glattfelden · Government Authority · CMP-0110

Vantage Data Centers · Owner · CMP-0109

Investment Commitment

Amount not disclosed · 2024-04-11

Direct ZRH2 campus investment announcement; not described as a debt close.

Vantage Data Centers (Sponsor)

Financing record 25; claim-specific source links appear in the exhibit sources where published.

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.