Stream PHXA Goodyear Campus
- Planned critical IT
- 280 MW
- Updated
- Oct 29, 2026
Stream's PHXA campus is at 2950 South Litchfield Road in Goodyear, Arizona. The current plan covers 157 acres and seven buildings with 280 MW of full-build critical IT capacity. The first two buildings serve tenants, but the entire target is not presented as operational. The dedicated APS substation's ultimate 480 MW rating is a separate utility figure. Stream announced commissioning of Phoenix I in January 2021, following a Cox Business connectivity announcement in July 2020. Current operator material describes multiple carriers and closed-loop chillers at its new Phoenix facility; this does not establish identical equipment in every future building. Current campus operating MW, legal parcel ownership and project-specific financing remain unverified.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Milestones (2)
Jul 8, 2020 · Recorded actual event
Completed · Announced
Sources (1)
Jan 14, 2021 · Recorded actual event
Completed · Announced
Sources (1)
- Booming in The Desert: Stream Commissions New Phoenix Data Center · Jan 14, 2021 · Primary
Participants
Site & development
Site location
Reported rounded2950 S. Litchfield Road, Goodyear, AZ 85338; 157-acre campus, seven planned buildings. Street address is confirmed; no surveyed parcel polygon recovered.
SourceLand and site control context
Reported roundedOperator identifies the campus footprint; legal title holder and current financing vehicle are not independently established.
SourceTechnical specifications
Reviewed phx siteplan cooling context
Source reportThe July 2023 council agenda ordinance reports May 24, 2023 site plan approval for five two storey, approximately 400,000-square foot buildings on the roughly 104-acre expansion area. It describes rooftop air cooled chillers and proposed PAD screening changes. The unsigned agenda copy is not evidence of final rezoning enactment or completed buildings.
SourceAdditional project facts
Reviewed phx acquisition context
Source reportStream’s February 15, 2019 announcement reports acquisition of a 418,000-square foot facility on 157 acres in Goodyear for campus development. This is historical issuer reported acquisition, not current registered title or a verified purchase price.
SourceReviewed phx infrastructure context
Source reportStream’s case study reports completed relocation of sewer infrastructure to the western boundary and road upgrades on the eastern side. It says its onsite substation supplies the campus and provides a through flow path to neighbouring development. This does not verify that its ultimate 480 MW rating is energized.
SourceInfrastructure & permits
Technical details (4)
Reported context
Ultimate APS substation capacity is a distinct utility figure; no signed interconnection allocation or current metered demand recovered.
Reported context
Stream specifically describes closed-loop chillers at its new Phoenix data center. Do not infer identical equipment in every future building or zero total water use.
Reported context
Cox Business connection was announced in July 2020. Current operator page also lists multiple local and long-haul carriers.
Planned or represented
480 MW
Ultimate/design dedicated substation rating, separate from campus IT load; not an assertion of currently energized demand.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (2)
Operating · Goodyear, Arizona, United States
Same locality: Goodyear
Compare in a collectionOperating · Goodyear, Arizona, United States
Same locality: Goodyear
Compare in a collection