Skip to content

STACK ZUR01 Zurich Data Center Campus

Zurich, SwitzerlandPartially operational
Evidence
Planned critical IT
10 MW
Updated
Oct 28, 2026

STACK ZUR01 Zurich Data Center Campus, also known as STACK ZUR01, is a data center project in Zurich, Zurich, CH. Seven-acre, single-building Zurich campus with 10 MW of critical capacity. Hyperscale-specific design with separate power-generating sources and multiple data hall configurations. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Capacity

Reported capacity

Design

10 MW

Source

Reported capacity

Planned / design or future potential

10 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

STACK ZUR01 Zurich Data Center Campus, also known as STACK ZUR01, is a data center project in Zurich, Zurich, CH. Seven-acre, single-building Zurich campus with 10 MW of critical capacity. Hyperscale-specific design with separate power-generating sources and multiple data hall configurations. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Milestones (1)
Project-specific evidence refreshed and reconciled

Aug 29, 2026 · Recorded actual event

Completed · Status changed

Source not linked

Participants

STACK Infrastructure

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

STACK ZUR01 | Zurich | Zurich | CH

Source

Location context

Actual

STACK ZUR01 | Zurich | Zurich | CH

Source

Project location

Actual

Zurich, Zurich, CH

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

STACK Infrastructure publishes 10 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

10 MW is the operator published facility design or maximum power boundary; it is not measured tenant utilization.

Source

Operator or developer

Actual

STACK Infrastructure

Source

Current lifecycle

Actual

Operating or in phased operation

Source

Capacity classification

Actual

Design

Source

Capacity basis

Actual

10 MW is the operator published facility design or maximum power boundary; it is not measured tenant utilization.

Source

Customer utilization

Actual

Not publicly disclosed

Source

Source refresh date

Actual

2026-08-29

Source

Infrastructure & permits

Technical details (3)
Electric grid

Operational

10 MW

10 MW is the operator-published facility design or maximum power boundary; it is not measured tenant utilization.

Fiber

Operational

Hyperscale-specific design with separate power-generating sources and multiple data hall configurations.

Cooling system

Operational

Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (2)
STACK ZUR02 Zurich Data Center Campus

Operating · Zurich, Switzerland

Same locality: Zurich · Shared participant: STACK Infrastructure