STACK NVA05 Manassas Data Center Campus

Manassas, Virginia, United StatesPreconstruction
Capacity
150 MW
Planned critical IT
Lead participant
STACK Infrastructure
Developer
Last updated
Aug 28, 2026
Most recent public record update

About STACK NVA05 Manassas Data Center Campus

STACK NVA05 Manassas Data Center Campus, also known as STACK NVA05, is a data center project in Manassas, VA, US developed and operated by STACK Infrastructure. 54-acre Northern Virginia campus planned for four buildings and 150 MW of critical capacity. Scalable electrical and cooling infrastructure designed for hyperscale, AI and cloud deployments. 150 MW is the operator-published future facility or full-build design boundary.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load150 MWDesign · STACK NVA05 Manassas Data Center Campus
Future Potential150 MWDesign · STACK NVA05 Manassas Data Center Campus

Development

1 phases · 1 milestones
Development, permitting and phased deliveryAnnounced Or Preconstruction

150 MW is the operator-published future facility or full-build design boundary. It is not operating IT load.

Aug 28, 2026
Current source record reviewed for STACK NVA05
Completed

Infrastructure

Electric GridPlanned Or Represented

Scalable electrical and cooling infrastructure designed for hyperscale, AI and cloud deployments.

FiberPlanned Or Represented

STACK markets diverse fiber and carrier-neutral deployment options; installed and contracted capacity remain distinct.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

11 facts
Location Context
STACK NVA05 | Manassas | VA | US
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
150 MW
Design
Capacity Basis
STACK Infrastructure publishes 150 MW of critical IT capacity for this record boundary.
Actual
Location Context
STACK NVA05 | Manassas | VA | US
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
150 MW
Design
Capacity Basis
150 MW is the operator published future facility or full build design boundary.
Actual
Site Area
54 acres
Design
Building Count
4
Design
Adjacent Utility Infrastructure
Confirmed
Actual